My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017 001 Resolution
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2017 Resolutions
>
2017 001 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:58:11 PM
Creation date
8/21/2018 4:27:27 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Resolution
Number
001
Date
1/23/2017
Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
".esolution No. 2017-01 <br />age 3 <br />General Engineering Projects -Schedule 2 <br />Street Resurfacing <br />Minor Roads and Streets in Undeveloped Areas <br />Irrigation and Drainage Ditches <br />Landing Fields <br />Levees and Flood Walls <br />Off-Street Parking Lots <br />Retaining Walls <br />Sidewalks <br />Street Lighting Systems <br />Water Distribution Systems and Elevated Storage Tanks <br />Water, Coal, Oil and Gas Transmission Pipelines <br />Minimum Fees -Schedule 2 Cost of Construction <br />$100,000 ........................~................................................ 9% <br />X100,000 to $500,000 .........................................................Base fee of 9% of $100,000 <br />Plus 6% of amount over $100,000 <br />$500,000 to $1,000,000 ......................................................Base Fee of 6.6% of $500,000 <br />plus 5% of the amount over $500,000 <br />Over $1,000,000 ..................................................................Base Fee of 6% of $1;000,000 <br />Plus 4.9% of amount over $1,000,000 <br />(°) If, after the plans, profiles, specifications and estimates of costs for work authorized <br />and approved by the Council have been prepared by the Engineer, the proceedings for such work <br />is abandoned or is postponed for a period of more than six (6) months, or the actual construction <br />of such work is not commenced within nine (9) months after the date of delivery of said plans, <br />profiles, specifications and estimates of costs, then he shall be paid forthwith a sum equal to 75 <br />percent of the fee stated in Section 3(b), based on the total estimated cost of said improvements, <br />as full compensation for all work done up to that date upon the subject project. In the event the <br />proceedings for such work so abandoned, or postponed, is revived and actively pursued by the <br />Village, he shall perform the balance of the services to be rendered under this Agreement and not <br />previously performed, and he shall credit against the total compensation due any payments made <br />under Section 3(c). <br />(d) The fee provided in Section 3(b) hereof shall cover engineering services including <br />preliminary estimates and reports, complete detailed plans and specifications, preparation of <br />monthly and final estimates for contractor payments. The above schedule of fees does not <br />
The URL can be used to link to this page
Your browser does not support the video tag.