Laserfiche WebLink
APPENDIX A-Project Deliverables <br />MayfielcB 1/illage <br />Mayfield Village Civic Center Stormwater Retrofit Demonstration Project <br />14SWIF-LEW-26 <br /> <br />Ob ectives <br />Deliverables Deliverable <br />Units <br />Descri ion <br /> Publish RFP <br />1 RFP' <br />Stormwater <br />Management Develop Protect Pians or Design Documents <br />1 Plan <br />Successful completion of this project wili result in the. installation of approximately 7,100 square feet of permeable pavement at Mayfield <br />Demonstration <br />Practices <br />Execute Construction Contract <br /> <br />1 Contract Village Civic Center. Runoff from adjacent 20,D00 square foot area of existing asphalt parking lot will sheet flow to the permeable <br />pavement. <br /> Install Permeable Pavement 7,100 Square <br />Feet <br /> Develop PrdJect Fact Sheets 1 Fact Sheet <br /> CreatelMaintain Website 2 Websites <br /> Install Protect Signs 1 Sign <br />Education 8 <br />Outreach <br />Conduct Tour <br />1 Tour Project will be supported with an education and outreach component that will Include a project fact sheet, website, sign, ceremony and <br />presentation. <br /> Other: CRWP Annual Report ~ 1 Report <br /> Other: Ribbon Cutting Ceremony 1 Ceremony <br /> Other: Presentation at CRWP Board of Trustees <br />Meetin 1 presentation <br /> Reduce Nitro en Loadin s <br />4. pounds/year <br />' <br />Estimated Load <br />Reductions <br />Reduce Phos horns Loadin s <br />0.5 pounds/year <br />Load Reduction Estimates <br /> Reduce Sediment Loadin s 0.3 tons/year <br /> Submit semi-annual Technical Re its 4 Re orts <br />Project Re <br />ortin Submit uarteri Fiscal Re orts ~ 8 Re orts <br />p <br />g <br />Submit closin Fiscal Re ort <br />1 Re ort Submit required reports to Ohio EPA at specified Intervals <br /> Submit closin Technical Re ort 1 Re ort <br />