Laserfiche WebLink
Resolution No. 2012-04 <br />Page 2 <br />General En ing eering Projects - Schedule 1 <br />Airports <br />Bridges and Grade Separation Structures <br />Foundations <br />Dams and Hydraulic Structures <br />Highway and City Streets <br />Street Reconstruction <br />Incinerators <br />Intercepting, Relief, Storm or Sanitary Sewers <br />Outside Electrical Installations <br />Power Plants <br />Pumping Stations <br />Railway and Bus Terminals <br />Electrical Transmission and Distribution Facilities <br />Tunnels and Caissons <br />Ground or Underground Water Storage Facilities <br />Waterfront and Terminal Improvements <br />Water, Sewage and Industrial Treatment Plants <br />Water Intakes and Sewage Outlets <br />Minimum Fees - Schedule 1 <br />Cost of Construction <br />$100,000 or below .........................................................12% of actual cost <br />$100,000 to $500,000 Base Fee of .................................12% of $100,000 Plus 7.5% <br />of amount over $100,000 <br />$500,000 to $1,000,000 .................................................Base Fee of 8.4% of the first <br />$500,000 plus 6% of the amount <br />over $500,000 <br />Over $1,000,000 ..............................................................Base Fee of 7.2% of the first <br />$1,000,000 plus 5.8% of amount <br />over $1,000,000