My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002 012 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2002 Ordinances
>
2002 012 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:58:53 PM
Creation date
8/22/2018 3:58:13 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
012
Date
4/22/2002
Year
2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/14/2002 03:56 FAX 4404812231 MV PARRS AND RECREATION ? LA{V DIR Z004 <br />I • <br />i <br />necessary pipes, fixtures, and appurtenances shall be buried not less than six (6) feet below grade wherever possible <br />so as not to interfere with Grantors use of its premises. <br />Grantee, by exercising the rights herein granted, agrees that all trenches shall be backfilled with goad, <br />clean fill dirt, well compacted, and the area restored to a condition to conform wiih the remainder of Grantor's premises <br />and to substantially the same condition, including seeding, that existed prior to excavation and that the surface thereof <br />i <br />shall be on the same grade as adjacent lands. <br />Grantee or its agents shall at all times maintain with its equipment a minimum vertical clearance of <br />twelve feet (12) from Grantor's °faciliGes and a horrzontal distance of ten feet (10) from all poles or anchors, and any <br />excavations near a structure or-anchor shall incorporate methods to prevent soil strength reductions. Said water main <br />? <br />shall be installed at least twenty (20) feet from eny electrical structure. In addition to the above ground structures, the <br />? <br />underground cables of L-5-LA-L supplying the S.O.M. Campus of Progressive Insurance also occupy this property. <br />Proper cable support and protection shall be provided tn this distribution circuitry by the Grantee, its contractors, <br />successors and assigns. No above ground water main structures are permitted within the easement area. Seid water <br />main shall be visibly marked by; a permanent marker in ihe field where said water main enters and leaves the Grantor's <br />property along with another marker equidistant between the above-mentioned pofnts. Grantee is responsible for any <br />and all expenses associated with reinforcing or holding of Grantor's facilities to allow construction and or repair of said <br />water main, Grantee shall register said water main with the Ohio Utilities Protection Service. <br />i <br />Grantee will immediately repair, replace or pay for any and all damages of any kind whatsoever to <br />Grantors premises and will pay, Grantor for any and all damages to Grantors facilities located on said premises ceused <br />by or related to the installation, operating, maintenance, repair or removal of said water main. The design of said water <br />! <br />main should incorporate the expectation that the Grantor will be using very heavy and large equipment on the premises. <br />: <br />If buried grounding wires are damaged during water main installation, said damage shall be immediate[y reported to the <br />Grantor, i <br />- 2 -
The URL can be used to link to this page
Your browser does not support the video tag.