My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003 007 Resolution
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2003 Resolutions
>
2003 007 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:59:05 PM
Creation date
8/22/2018 4:33:40 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Resolution
Number
007
Date
12/15/2003
Year
2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLU'TION NO. 2003-07 <br />PAGE THREE <br />General En ineering Projects - Schedule 2 <br />Street Resurfacing <br />Minor Roads and Streets in Undeveloped Areas Irrigati.on and <br />Drainage Ditches <br />Landing Fields <br />Levees and Flood Walls <br />Off-Street Parking Lots <br />Retaining Walls <br />Sidewalks <br />Street Lighting Systems <br />Water Distribution Systems aind Elevated Storage Tanks Water, Coal, <br />Oil and Gas Transmission Pipelin.es <br />Minimum. Fees-Schedule 2 <br />Cost of Construction <br />$100,000 ...................................................................... 9% <br />$100,000 to $500,000 ................................................... Base fee of 9% of $100,000 <br />Plus 6% of amount over $100,000 <br />$500,000 to $1,000,000 ................................................ Base Fee of 6.6% of $500,000 <br />plus 5% of the amount over $500,0000 <br />Over $1,000,000 ........................................................... Base Fee of 6% of $1,000,0000 <br />Plus 4.9% of amount over $1,000,000 <br />(c) If, after the plans, profiles, specifications and estimates of costs for work authorized <br />and approved by the Council have been prepared by the Engineer, the proceedings for such <br />work is abandoned or is postponed for a period of more than six (6) months, or the actual <br />constauctaon of such work is not commenced within nine (9) pnonths after the date of delivery <br />of said plans, profiles, specifications and estimates of costs, then he sha11 be paid forthwith a <br />sum equal to 75 percent of the fee stated in Section 3(b), based on the total estimated cost of <br />said improvements, as full compensation for all work done up to that date upon the subject <br />project. In the event tbe proceedings for such vvork so abandoned, or postponed, is revived and <br />actively pursued by the Village, he shall perform the balance of the services to be rendered <br />under tbis Agreement aud mot previously performed, and he shall credit against the total <br />compensation due any payments made under Section 3(c).
The URL can be used to link to this page
Your browser does not support the video tag.