Laserfiche WebLink
06/25/2004 FRI 8:51 FAX 440 442 5077 MV BLDG DEPT <br />woRK ORDER Noy ~ <br />S.O.1VX. CENTER./WHITE ROAD WIDENING <br />ON-SITE REPRESENTATION DURING CONSTRYJC'I'ION <br />YJRS CQRpORATION/MAYFXELD VILLAGE <br />AGREENYENT DATED FEBRUARY 3,1995 <br />MOVIFICA,TION NO.10 -Dated June 2, 2004 <br />'I'bis 'Work Order Task is being performed as an extension of the Professional Engineering Services <br />A.greemont between Mayfield Village and URS Corporation (URS), formerly known as URS <br />Greiner, dated February 3, 1998. A11 terms and conditions stated therein are incorporated into this <br />Work Order by reference. This work order represents the construction observation services <br />previously provided under Work Order No. S, additional services associated with the MOD NO. I <br />modifications due to increasing the length of the S.O.M. Center Road widening to Wilson Mills Road <br />ar~d additional services associated with a longer duration of construction contract and provisions for <br />materials testing. The 11aTod No. YO modifccations to ahe base document, which was previously <br />approved by the Client, are annotated by bold italics font. <br />SCOPE OF SERVICES <br />This Work Order provides for resident representation and materials testing during the construction of <br />the widening and reconstruction of S.O.M. Center/White Roads. S.O.M. Center Road would be <br />widened to five {5) lanes for an estimated Iength of twelve thousand seven hundred (12,700) lineal <br />foot. White Road would be widened to three (3) lanes for an estimated length of twelve hundred <br />{i,200) lineal foot. The design, plan preparation, and construction phase services would be <br />performed to be consistent r~vith the new ODOT Local Public Agency Policy. <br />URS will provide the following specil:lc consulting services in assisting the Client during the <br />construction phases of the project: <br />Construction Phase -Inspection and Observation Services: URS shall provide during the active <br />Construction Phase three (3) fall-time equivalent inspector(s) for a period not to Exceed twenty-four <br />(24} months to endeavor to provide further protection for the Client against defects and deiieieneics <br />in the Work. The furnishing of such observation shall not make CJRS responsible for construction <br />means, methods, techniques, sequences, or procedures, or for the Contractor's failure to perform the <br />Work in accordance with the Contract Documents. The task includes the following: <br />I. URS' inspector shall assist in determining the quantities and dollar amounts owing to the <br />Contractor, based an-site observations and on evaluations of the Contractor's Applications for <br />Payment. The accuracy of each Application for 1'ayrnent shall remain the primary <br />responsibility of the Contractor. <br />2. URS inspector shall attEnd job meetings held with the Contractor to coordinate the Work and <br />discuss problems that nxay arise concerning proper timing and execution of the Wvrk. UIZS <br />shall preside and take minutes of the meetings and reproduce and distribute such minutes to <br />those in attendance. <br />~j012/014 <br />J;~I'ropos~Is~M:,rketing\Gontracts~iviayfietd lU-5n9o7.00\W07 MOn1U.doc <br />