Laserfiche WebLink
r <br />Mayfield Village S.O.M. Center Road <br />Multicetl Innerduct Modification <br />Cast Estimate <br /> Quantliy Estimate Totaf <br />Item Foci. L.F, Cost Cost <br />193 825 25920 Conduit , Mlsc.: Conduit, 4" wlttt 4 cell Innerduct, Type 713.07 300 57.70 $2,310.00 <br /> S.O.M. Crossing at Wilson Mills Road <br /> Sta. 55+74, 43' Lt. To Sta, 55+7~.5, 36.5' Rt. (82 L,F.) <br /> S.O.M. Crossing at Beta Drive <br /> Sta. 85+12, 55.5' Lt. To Sta. 85+38, 39.5' Rt. (98 L.F.} <br /> S.O.M. Crossing at Parkview Drive <br /> Sta. 941+48, 78' Li. To Sta, 149+35, 41.5' Ri. (120 L.F.) <br /> PorElon to be Jacked or Drilled Under Pavement (75 L.F.) <br />196 625 30706 Pull Box, 713.08, 24" 7 S710.00 $4,970.00 <br />625 29000 Trench 225 54.75 $1,068.75 <br />SPB25 Conduit Jacked or Drilled Under Qavement, 4" with 3•cell 75 $29.00 52,175.00 <br /> Inner<luct 713.04 of 793.07 Schedule 80 <br />Cost of Construction <br />See bid tabulation from t?DOT 660-03 (ref# 21). Costs f~ave risen due to <br />resin costs and higher labor rates. 560-03 was chosen as it represents <br />a fairly recent bid that MCC was awarded. Also, smaller quantity. <br />Our unit price for ref # 196 this project is acceptable <br />Our unit price for ref #494 this project is acceptable <br />See bid tabulation from ODOT 660-03 and above explanation (ref 24) <br />0 <br />--i <br />D <br />r <br />m <br />ti <br />$1 Q,523.75 <br />