Laserfiche WebLink
r` <br />• -~ <br />.~ <br />NUMBER: ~4~ <br />DATE: August 13, 2004 564-AWhite Pond Drive <br />Akron, Ohio 44320 <br />JOB NO. 15015747.00000 TEL: (330) 836-9111 # FAX: (330) 836-9115 <br />TO: Mr. Jim Sutter <br />FIRM: The Great Lakes Construction Company <br />2608 Great Lakes Way <br />SUBJECT: S.O.M. Center Road <br />Hinckley, Ohio 44233 PROJECT MGR. <br />Submittal No. 5015747-0042-01 <br />Change Order No.2 <br />Douglas L. Dillon, P.E., P.S. <br />We are sending you Attached t Under Separate Cover Via the following items: <br />t Shop Drawings t Drawings (Prints) t Proposal Request t Copy of Letter <br />t Product Data I' Project Manual ~ Change Order t <br />t Samples t Tracings t Technical Specifications <br />COPIES DRAWING NUMBER DATE DESCRIPTION DISP. <br />1 13AUG04 Chan a Order and Extra Work Order No. 2 1,3 <br /> <br /> <br /> <br /> <br />These are transmitted for the following disposition: <br />1. For Your Approval 4. For Review and Comment <br />2. For Your Use and Information 5. For Bidding <br />3. As Requested 6. For Construction <br />Note: Drawings and Specifications shall not be used for construction unless noted: "For Construction" <br />Remarks: Jim: <br />Please review the attached documents and have them signed. I will need them back Monday August 16, 2004 <br />in order to present them to Council. If you have any questions, please do not hesitate to call. <br />Copies to: J. Bernot, File: 15015747.50.06 <br />7. Conforms As Is <br />8. Conforms as Noted <br />9. Does Not Conform <br />10. Other <br />DgUglas L. Dillon, P.E., P.S. <br />Rev. 8-21-00 <br />J:\I674700150.06 Contract Changes-ExtraslTransmittal 040 -Change Order Extra Work Order No.2 to GLCC.doc <br />