Laserfiche WebLink
v <br />August 13, 2004 <br />Mr. Phillip M. Brett <br />Director of Finance and Economic Development <br />Mayfield Village <br />6621 Wilson Mills Road <br />Mayfield Village, Ohio 44143 <br />Subject: CUY-91-13.29 - SOM Center Road <br />Change Order No. 2 and Extra Work Order No. 2 <br />Letter No. 047 <br />Dear Mr. Brett: <br />The Great Lakes Construction Company has submitted the appropriate back-up documentation for Change <br />Order No. 2 and Extra Work Order No. 2. Both Change Order No. 2 and Extra Work Order No. 2 are <br />associated with three issues further explained below. <br />ISSUE No. l -ADD SLEEVES FOR IRRIGATION CONDUIT FOR MEDIAN ISLANDS. <br />The Village requested sleeves be placed under the pavement to allow the installation of irrigation conduit for <br />the median island. The sleeves were installed to allow the irrigation conduit to be installed at a later date <br />without .disturbing the recently improved roadway pavement. A similar request was made last year for the <br />Phase 1 pavement and was incorporated into Change Order No. 1. This modification will provide access to <br />the medians for the remainder of the project and results in an addition to the contract value of $35,800.00. <br />ISSUE No. 2 -ADDITIONAL INNERDUCT CONDUIT AND ACCESS POINTS. <br />The Village requested additional access be made available to the innerduct systems detailed in the contract <br />documents. The Contractor has submitted a price for this additional work. This change to the contract <br />documents creates an addition to the contract value of $10,760.75. <br />The additional ITEM 625 -CONDUIT, MISC.: CONDUIT, 4" WITH 4 CELL INNERDUCT, TYPE 713.07 <br />amounts to $1,500.00. The additional ITEM 625 -TRENCH amounts to $1,080.00. The additional ITEM <br />625 -PULL BOX, 713.08, 24" amounts to $4,970.00. The previously noted three items are Reference No. <br />193, No. 194, and No. 196 respectively. These items are accounted for by Change Order and contract <br />extension of quantities. <br />The additional cost associated with this work and the non:contract items are accounted for in the Extra Work <br />Order. ITEM 625 -CONDUIT, MISC.: CONDUIT, 4" WITH 4 CELL INNERDUCT, TYPE 713.07 <br />accounts for $927.00 in Extra Work. The additional work for the CONDUIT JACKED OR DRILLED <br />UNDER PAVEMENT, 4" WITH 3-CELL INNERDUCT, 713.04 OR 713.07 SCHEDULE 80 accounts for <br />$2,283.75 in Extra Work. <br />The backup documentation provided contains a math error accounting for the difference in the price <br />presented in the Change Order/Extra Work Order. <br />ISSUE No. 3 -CEI UTILITY POLE SUPPORT FEE. <br />CEI required the Contractor to pay a fee for supporting a utility pole in close proximity to the proposed <br />waterline installation. This condition also creates an addition to the contract value of $4,129.65, which <br />consists of the fee paid ($3,933.00) and the Contractor's 5% markup ($196.65). The backup documentation <br />provided contains a math error accounting for the difference in the final price presented in the Change <br />Order/Extra Work Order. <br />';I URS Corporation <br />564 White Pond Drive <br />Akron, OH 44320-1100 <br />Tel: 330.836.9111 <br />Fax: 330.836.9115 <br />