My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004 034 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2004 Ordinances
>
2004 034 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:59:32 PM
Creation date
8/22/2018 5:23:48 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
034
Date
7/19/2004
Year
2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~~~11.42- r~ ortD. aoo4.3~F <br />CUYAHOGA COUNTY ENGINEER <br />ROBERT C. KLAIBER, Jr., Pe., Ps. <br />2100 Superior Viaduct Cleveland, Ohio 44113 <br />(216) 348-3800 FAX 348-3896 TTD 348-3928 <br />July 28, 2004 <br />Hon. Bruce G. Rinker <br />Mayor, Village of Mayfield <br />6621 Wilson Mills Road <br />Mayfield, Ohio 44143 <br />~"~~t ~ . <br />~iAyF~E~®9 oDy <br />~~<<'~GE <br />Re: Ridgebury Road Resurfacing <br />Richmond Road (SR-175) to SOM Center Road (SR-91) <br />In the Cities of Mayfield Heights, Highland Heights, <br />Lyndhurst and the Village of Mayfield <br />Dear Mayor Rinker, <br />cc: Mayor <br />Counc~ <br />Dept H®ads <br />-~~ <br />(.~ '~~Y' <br />~~ <br />~,! <br />This is a follow-up to our July 7, 2004 letter outlining the proposed funding breakdown <br />for the above referenced resurfacing project. <br />As stated in that letter, the village will be responsible for fifty percent (50%) of the non- <br />federal share of the cost of construction within the village limits and forty percent (40%) <br />of the cost for the preparation of the plans and specifications. At that time we provided a <br />cost only for the construction of the project and did not include a cost for the plan <br />development. Currently, we are estimating that the cost for the plan development will be <br />approximately $220,000.00. Therefore, the total cost to the Village of Mayfield for the <br />plan development and construction will be approximately $24,800.00. <br />Should you have any questions regarding this subject, please feel free to contact me at <br />(216) 348-36.8. , <br />RCK/TJG <br />RidgeburyEngineeringNotification.HH <br />C: Village of Mayfield: Tom Cappello, Village Engineer <br />CCEO: Kosilesky, Driscoll <br />Very truly yours, <br />ROBERT C. KLAIBER JR., P.E., P.S. <br />CUYAHOGA CO Y ENGINEER <br />r <br />Ja Husani, P.E. <br />Chief Transportation and Traffic Engineer <br />PACE <br />Loe.i I•W IB <br />
The URL can be used to link to this page
Your browser does not support the video tag.