Laserfiche WebLink
~~~11.42- r~ ortD. aoo4.3~F <br />CUYAHOGA COUNTY ENGINEER <br />ROBERT C. KLAIBER, Jr., Pe., Ps. <br />2100 Superior Viaduct Cleveland, Ohio 44113 <br />(216) 348-3800 FAX 348-3896 TTD 348-3928 <br />July 28, 2004 <br />Hon. Bruce G. Rinker <br />Mayor, Village of Mayfield <br />6621 Wilson Mills Road <br />Mayfield, Ohio 44143 <br />~"~~t ~ . <br />~iAyF~E~®9 oDy <br />~~<<'~GE <br />Re: Ridgebury Road Resurfacing <br />Richmond Road (SR-175) to SOM Center Road (SR-91) <br />In the Cities of Mayfield Heights, Highland Heights, <br />Lyndhurst and the Village of Mayfield <br />Dear Mayor Rinker, <br />cc: Mayor <br />Counc~ <br />Dept H®ads <br />-~~ <br />(.~ '~~Y' <br />~~ <br />~,! <br />This is a follow-up to our July 7, 2004 letter outlining the proposed funding breakdown <br />for the above referenced resurfacing project. <br />As stated in that letter, the village will be responsible for fifty percent (50%) of the non- <br />federal share of the cost of construction within the village limits and forty percent (40%) <br />of the cost for the preparation of the plans and specifications. At that time we provided a <br />cost only for the construction of the project and did not include a cost for the plan <br />development. Currently, we are estimating that the cost for the plan development will be <br />approximately $220,000.00. Therefore, the total cost to the Village of Mayfield for the <br />plan development and construction will be approximately $24,800.00. <br />Should you have any questions regarding this subject, please feel free to contact me at <br />(216) 348-36.8. , <br />RCK/TJG <br />RidgeburyEngineeringNotification.HH <br />C: Village of Mayfield: Tom Cappello, Village Engineer <br />CCEO: Kosilesky, Driscoll <br />Very truly yours, <br />ROBERT C. KLAIBER JR., P.E., P.S. <br />CUYAHOGA CO Y ENGINEER <br />r <br />Ja Husani, P.E. <br />Chief Transportation and Traffic Engineer <br />PACE <br />Loe.i I•W IB <br />