Laserfiche WebLink
Resolution No. 2004-04 <br />Page 4 <br />(d) The fee provided in Section 3(b) hereof shall cover engineering services <br />including preliminary estimates and reports, complete detailed plans and specifications, <br />preparation of monthly and final estimates for contractor payments. The above schedule <br />of fees does not include property, top.ographic, boundary or right-of-way surveys, lines <br />and grade stakes, resident engineer, inspection of materials; cost of test borings, or other <br />subsurface explorations, or calculation of special assessments. These latter services may <br />be provided by the Engineer on an hourly basis in accordance with the schedule of rates <br />hereinafter set forth in Section 3(e). Specialized services shall be done by Sub- <br />consultants and their fees shall be approved by the Village prior to doing the work. <br />(e) For all engineering services in connection with any and all public <br />improvements constructed by the Village in cooperation with any Federal or State <br />agencies, or work not let by contract, or for special surveys, reports, etc., or for the <br />preparation of special assessments and for any and all services not specified above nor <br />incident. to nor connected with the construction of public improvements, subject to the <br />terms of Section 3(fl, compensation shall be made on the basis of time spent by him or <br />his employees and associates at the rates set forth in the following schedule of hourly <br />rates. <br />Engineer ...........................:........................................ $84.00 <br />Draftsman ................................................................. $42.00 <br />Inspectors .................................................................. $34.00 <br />Two-Man Field Crew consisting of <br />Party Chief and Instrument Man .............................. $90.00 <br />Three-Man Field Crew consisting of Party <br />Chief, Instrument Man & Rod Man ......................... $119.00 <br />Party Chief ................................................................ $48.00 <br />Instrument Man ......................................................... $38.00 <br />Rod Man ................................................................... $27.00 <br />Auto CADD ...........................................:.................. $42.00 <br />Materials, Supplies and Services by Others ............. Cost <br />Payment shall be made under this Section at the completion of each service and <br />upon billing by the Engineer. The Engineer shall provide such documentation as the <br />Village deems necessary to substantiate such bills.