My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004 020 Resolution
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2004 Resolutions
>
2004 020 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:59:43 PM
Creation date
8/22/2018 6:11:32 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Resolution
Number
020
Date
8/16/2004
Year
2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION NO. 2004-20 <br />PAGE THREE <br />General Engineering Projects - Schedule 2 <br />Street Resurfacing <br />Minor Roads and Streets in Undeveloped Areas <br />Irrigation and Drainage Ditches <br />Landing Fields <br />Levees and Flood Walls <br />Off-Street Parking Lots <br />Retaining Walls <br />Sidewalks <br />Street Lighting Systems <br />Water Distribution Systems and Elevated Storage Tanks <br />Water, Coal, Oil and Gas Transmission Pipelines <br />Minimum Fees - Schedule 2 <br />Cost of Construction <br />$100, 000 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 9 % <br />$100,000 to $500,000 .................................. Base Fee of 9% of $100,000 <br />Plus 6% of amount <br />over $100,000 <br />$500,000 to $1,000,000 ............................... Base Fee of 6.6% of $500,000 <br />Plus 5% of amount over $500,000 <br />Over $1,000,000 ........................................ Base Fee of 6% of $1,000,000 <br />Plus 4.9% of amount over <br />$1,000,000 <br />(c) If, after the plans, profiles, specifications and estimates of costs for <br />work authorized and approved by the Council have been prepared by the <br />Engineer, the proceedings for such work is abandoned or is postponed for a <br />period of more than six (6) months, or the actual construction of such work is not <br />commenced within nine (9) months after the date of delivery of said plans, profiles, <br />specifications and estimates of costs, then he shall be paid forthwith a sum equal <br />to 75 percent of the fee stated in Section 3(b), based on the total estimated cost of <br />said improvements, as full compensation for all work done up to that date upon the <br />subject project. In the event the proceedings for such work so abandoned, or
The URL can be used to link to this page
Your browser does not support the video tag.