My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004 034 Resolution
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2004 Resolutions
>
2004 034 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:59:46 PM
Creation date
8/22/2018 6:30:07 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Resolution
Number
034
Date
12/6/2004
Year
2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution No. 2004-34 <br />Page 4 <br />(d) The fee provided in Section 3(b) hereof shall cover engineering services <br />including preliminary estimates and reports, complete detailed plans and specifications, <br />preparation of monthly and final estimates for contractor payments. The above schedule of <br />fees does not include property, topographic, boundary or right-of-way surveys, lines and <br />grade stakes, resident engineer, inspection of materials, cost of test borings, or other <br />subsurface explorations, or calculation of special assessments. These latter services may be <br />provided by the Engineer on an hourly basis in accordance with the schedule of rates <br />hereinafter set forth in Section 3(e). Specialized services shall be done by Sub-consultants <br />and their fees shall be approved by the Village prior to doing the work. <br />(e) For all engineering services in connection with any and all public <br />improvements constructed by the Village in cooperation with any Federal or State agencies, <br />or work not let by contract, or for special surveys, reports, etc., or for the preparation of <br />special assessments and for any and all services not specified above nor incident to nor <br />connected with the construction of public improvements, subject to the terms of Section <br />3( fl, compensation shall be made on the basis of time spent by him or his employees and <br />associates at the rates set forth in the following schedule of hourly rates. <br />Engineer .......................................................................... $ 86.00 <br />Draftsman ....................................................................... $43.00 <br />Inspectors ................................................................................. $35.00 <br />Two-Man Field Crew consisting of <br />Party Chief and Instrument Man ...................................... $93.00 <br />Three-Man Field Crew consisting of Party <br />Chief, Instrument Man & Rod Man ............................. $122.00 <br />Party Chief ...................................................................... $49.00 <br />Instrument Man .............................................................. $38.00 <br />Rod Man ......................................................................... $27.00 <br />Auto CADD .................................................................... $43.00 <br />Materials, Supplies and Services by Others ............... Cost <br />Payment shall be made under this Section at the completion of each service and <br />upon billing by the Engineer. The Engineer shall provide such documentation as the <br />Village deems necessary to substantiate such bills.
The URL can be used to link to this page
Your browser does not support the video tag.