Laserfiche WebLink
Resolution No. 2004-34 <br />Page 4 <br />(d) The fee provided in Section 3(b) hereof shall cover engineering services <br />including preliminary estimates and reports, complete detailed plans and specifications, <br />preparation of monthly and final estimates for contractor payments. The above schedule of <br />fees does not include property, topographic, boundary or right-of-way surveys, lines and <br />grade stakes, resident engineer, inspection of materials, cost of test borings, or other <br />subsurface explorations, or calculation of special assessments. These latter services may be <br />provided by the Engineer on an hourly basis in accordance with the schedule of rates <br />hereinafter set forth in Section 3(e). Specialized services shall be done by Sub-consultants <br />and their fees shall be approved by the Village prior to doing the work. <br />(e) For all engineering services in connection with any and all public <br />improvements constructed by the Village in cooperation with any Federal or State agencies, <br />or work not let by contract, or for special surveys, reports, etc., or for the preparation of <br />special assessments and for any and all services not specified above nor incident to nor <br />connected with the construction of public improvements, subject to the terms of Section <br />3( fl, compensation shall be made on the basis of time spent by him or his employees and <br />associates at the rates set forth in the following schedule of hourly rates. <br />Engineer .......................................................................... $ 86.00 <br />Draftsman ....................................................................... $43.00 <br />Inspectors ................................................................................. $35.00 <br />Two-Man Field Crew consisting of <br />Party Chief and Instrument Man ...................................... $93.00 <br />Three-Man Field Crew consisting of Party <br />Chief, Instrument Man & Rod Man ............................. $122.00 <br />Party Chief ...................................................................... $49.00 <br />Instrument Man .............................................................. $38.00 <br />Rod Man ......................................................................... $27.00 <br />Auto CADD .................................................................... $43.00 <br />Materials, Supplies and Services by Others ............... Cost <br />Payment shall be made under this Section at the completion of each service and <br />upon billing by the Engineer. The Engineer shall provide such documentation as the <br />Village deems necessary to substantiate such bills.