Laserfiche WebLink
RESOLUTION NO. 95-33 <br />Page 2 <br />Tunnels and Caissons <br />Ground or Underground Water Storage Facilities <br />Waterfront and Terminal Improvements <br />Water, Sewage and Industrial Treatment Plants <br />Water Intakes and Sewage Outlets <br />Minimum Fees - Schedule 1 <br />Cost of Construction: <br />$100,000 - <br />$100,000 - 500,000 <br />$500,000 - 1,000,000 <br />$1,000,000 - 5,000,000 <br />12% <br />Base Fee of 12% of $100,000 <br />Plus 7.5% of amount over <br />$100,000 <br />Base Fee of 8.4% of $500,000 <br />Plus 6% of amount over $500,000 <br />Base Fee of 7.2% of $1,000,000 <br />Plus 5.8% of amount over <br />$1,000,000 <br />...General Engineerinq Proiects - Schedule 2 <br />Street Resurfacing <br />Minor Roads and Streets in Undeveloped Areas <br />Irrigation and Drainage Ditches <br />Landing Fields <br />Levees and Flood Walls <br />Off-Street Parking Lots <br />Retaining Walls <br />Sidewalks <br />Street Lighting Systems <br />Water Distribution Systems and Elevated Storage Tanks <br />Water, Coal, Oil and Gas Transmission Pipelines <br />Minimum Fees - Schedule 2 <br />Cost of Construction: <br />$100,000 - <br />$100,000 - $500,000 <br />9% <br />0 <br />Base Fee of 9% of $100,000 <br />Plus 6% of amount over $100,000 <br />$500,000 - $1,000,000 <br />$1,000,000 - $5,000,000 <br />Base Fee of 6.6% of $500,000 <br />Plus 5% of amount over $500, 000. <br />Base Fee of 6% of $1,000,000 <br />Plus 4.9% of amount over <br />$1,000,000