Laserfiche WebLink
- - ~ - (d) Electrical Permits <br />1. Alteration base fee <br />2. New Multi-family/commercial base fee <br />3. For each receptacle outlet <br />4. For each lighting fixture <br />5. For each four feet of continuous neon tubing <br />6. For each motor <br />7. For each heating outlet <br />8. Illuminating signs. <br />9. Panel boards <br />10. Intrusion and smoke/fire detection systems <br />(e) Heating and ..Air. Conditioning Permits <br />1. New Heating system in Multi-family/commercial <br />2. Replacement of central heating system <br />3. Installation of unit or space heater <br />4. Air conditioning system <br />$3.00 per ton or fraction thereof <br />Split systems are treated as two separate systems <br />~~E.. Solar or geothermal system <br />(f) Certificate of Occupancy <br />1. Residential single and two-family dwellings <br />2. Commercial -new buildings - <br />3. -Commercial -change of tenant <br />4. Multi-family annual certificate of occupancy and <br />inspection fee -per suite <br />(g) ' Miscellaneous Permits <br />(1) <br />(2) <br />(3) <br />(4) <br />(5) <br />(6) <br />(7) <br />(g) <br />(g) <br /> <br />Siding - <br />Foundation waterproofing <br />Gutters/downspouts <br />Roofing <br />Contractor Registration for service provided to a resident <br />Construction Trailers -per calendar day <br />Removal of trees (chapter 1359) <br />Soil removal (chapter 1371) <br />Per Acre or fraction thereof <br />Recreation vehicles <br />20.00 <br />150.00 <br />.50 <br />.50 <br />.50 <br />5.00 <br />5.00 <br />15.00 <br />10.00 <br />25.00 <br />60.00 <br />35.00 <br />35.00 <br />35.00+ <br />50.00 <br />-0- <br />10.00 <br />10.00 <br />10.00 <br />25.00 <br />25.00 <br />25.00 <br />25.00 <br />25.00 <br />1.00 <br />10.00 <br />50.00 <br />5.00 <br />