My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995 056 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
1995 Ordinances
>
1995 056 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:00:13 PM
Creation date
8/22/2018 8:33:35 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
056
Date
8/21/1995
Year
1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARTICLE 9 <br />- - ENUMERATION OF CONTRACT DOCUMENTS <br />9.1 The Contract Documenu, e.~tcepc for Modifications issued after execution of this Agreement, are enumerated as follows: <br />9.1.1 The Agreement is this executed Standard Form of Agreement Between Oawtler and Contractor, AIA Document A101, 1987 <br />Edition. <br />9.1.2 The General Conditions are the General Conditions of the Contract for Construction, AIA Document A201, 1987 Edition• <br />9.1.3 The Supplementary and other Conditions of tkle' and etas follows contained in the Project Manual dated <br />Document <br />Title Pages <br />All drawings dated April 4, 1995 including drawings X-1 through X-12 <br />inclusive prepared by Stephen Hovancsek and Associates and drawings S-1 <br />through S-4 inclusive prepared by Rauschenbach, Casini and Urban. All <br />. drawings dated June 2, 1995 including Drawings A-1 through A-23, P1 <br />through P4, FP-1 through FP-3, H-1 through H-5, E-1 through E-16, <br />inclusive prepared by Rauschenbach, Casini and Urban, specifications <br />prepared by Rauschenbach, Casini and Urban and Panzica Construction <br />Company dated June 2, 1995 including Divisions 0 through 16, <br />Addendum #1 dated April 17, 1995; Addendum #2 dated April 18, 1995; <br />Addendum #3 dated Apri120, 1995, Addendum #4 dated June 13, 1995, <br />Addendum #5 dated June 20, 1995, and Addendum #6 dated June 23, <br />.1995. <br />_,.~. <br />~: <br />9.1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 9.1.3, and are as follows: <br />(Ettber fist the Specifications here or refer to an esbibit attached to tbu Agseement) Pages <br />Section Title <br />See Article 9.1.3 <br />AIA DOCUMENT A101 •OWNER-CONTRACTOR AGREEMENT • TWELFTH EDITION • AlA® • ©1987 ~ A701-1987 6 <br />THE A,~tERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE. N.W., WASHINGTON. D.C. 20006 <br />WARNING: Unlicensed Photocopying violates U.S. copyright laws and is subject to legal prpsecutlon. <br />
The URL can be used to link to this page
Your browser does not support the video tag.