My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995 074 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
1995 Ordinances
>
1995 074 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:00:17 PM
Creation date
8/22/2018 9:03:53 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
074
Date
10/16/1995
Year
1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ADMINISTRATION FAX NO 216461055 r u~ <br />ARTICLE 5 <br />PROGRESS PAYMENTS <br />.1 Hascd upon Applications for Paymcnt submi[tcd to the Architcct by the Contractor and CcrtifiCates for Paymcnt issued by [!Ze <br />Architect, the Owner shall maize progress payments on account of the Contract Sum to the Contracwr as provided below 'and <br />elsewhere In the Contract Documents, <br />5.2 The period Covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as <br />follows: <br />5.3 Pr~vidrd an Application for Payment is received by the Architect trot later thar1 the <br />30tH day oFa month, the Owner Shall make payment to the Contractor not later than <br />the 30tH ~Y of ~~ follnwirtg month. If an Applica[ion for Payment 15 received by the <br />Architect after the application date fixed above, payment shall be made by [he Owner not later than 60 <br />days after the Architcct receives the Application for Payment. <br />5.4 Each Appiiea[ion fpr Pa~'mcnt shall Ue based upon the schedule of values submitted by the Contractor in accordance with <br />the Contract Documents, 1'hc schedule of values shall allocate the entire Conuact Sum among [he various por[ions of the Work <br />and be prepared in such firm anCl suppor[ed by such data to subsuntia[e its accuracy as [he Architect may require, This schedule, <br />unless ol)jectcd to by the Architcct, shall be uses! as a basis for reviewing the Contractor's Applications fur Payment. <br />5.5 Applications for Paymcnt shall indicate the percentage of completion of each portion of the Wnrk as of the end of the period <br />covered by the Application fc)r Payment. <br />5,6 Subjcet to the provisions of the Contract Documents, the amount of each progress paymen[ shall be computed as follows: <br />5,6.1. Take [hat portion of the Contract Sum properly allocable [o comple[ed Work as determined by multiplying t11e perccnt~tge <br />completion of cacti portion of the Work by [he share of [he total Contract Sun1 allocated to that portion of the Work in the schedule <br />of values, less retainage of i ht percent <br />( °.L), Pending final determination of cost tc~ tic Oa ncr of changes in the Work, amounts not in the d[spute may be <br />included as~rovided in SuI)l~aragraph 7,3,7 of the General Conditions even though the Contract Sum has not yet Ueen adjusted <br />by Change Order; <br />5,6.2 Add that pc)rtion of the Contract Sum properly allocable to materi:ils and equipment delivered and suitably stored at the <br />site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the <br />si[e at a location agreed upon in writing), less retai:tagc of eight purrent <br />percent ( g `~), <br />5.6.3 Subtract the a r y not applicable <br />~.egate of previous payments made b [he Owner; and <br />5,6.4 Subtract amounts, if any, for which the Arc!liteCt has withheld or nuitified a Certificate Cor Payment as provided in Para- <br />graph 9,S of the General Conditions. <br />5.7 The progress payment amount determined in accordance with Paragraph 5.6 shall be Fur[her modified under the Following <br />circutnstancas: <br />5.7.1 Add, upon Substantial Completion of the Work, a sum sufFcient to increase the coral payments to ~) of the Contract <br />One huntirec! percent ( 100 <br />Sum, less such amounts as thr Architect shall determine for incomplete Work and unse[tled ciatms; and <br />5,7.2 Add, if Tina! completion of the Worlt Is [hereafter matcri;illy delayed through no fault of the Contractor, any additional <br />ant0unt8 payable in accordance wi[h Subparagraph 9.10.3 of the Gcncral Conditions. <br />5.8 Reduction or limitation of retainage, if any, shall be as follows: Not applicable g _ <br />R~ pns itrt+~l~a~r d~5.r~~> ruA~ =;hsra,rd rb(CnMU~itu~(dcf r+rd efseulrere bt tLe~ Gonfrue•t Dvc tmettlsl bt,ert bere pro ~fririt+ns jUrPucbetreduct On yr ~n ltvtr~cirr,)a <br />Aid DOCUMENT A10~ ° OVcNER-C.QNTRACTQR AGRLLMGNT ~ TWHt•BTtt EDITioN ~ A[A'~ • cytvn; <br />THE AMERICAN lNS'rlTl ITI; c7F ARCHI~'I:C75, 17iS NER' YQRh AVcNL'E, N.W., WA5HUVGTQN, D•C. 200U6 A 1®~-1987' ~ <br />----~ <br />