Laserfiche WebLink
2.6.4 Tlle Architect shall be a representative of vid sh:ill advise <br />and consul[ wich the Owner (1) during conscruction until final <br />payment to the Contractor is due, and (2) as an Additional Ser- <br />vice at ihe Owner's direction from cime to time during the cor- <br />rection period described in the Concract for Construc[ion. The <br />.Architect shall have authoricy to act on behalf of the OR-ner <br />only ro[he ex[ent provided in this Agreement unless o[hernise <br />modified by written instrument. <br />2.6.5 The Architect shall visit the si[e a[ intervals appropria[e <br />co the scage of construction or as ocherwise agreed by the <br />Owner and Architect in n-riting to become generally familiar <br />wi[h the progress and quality of the Work compleced and to <br />deremline in general if the Work is being performed in a man- <br />ner indicating that the Work- n•hen completed will be in accor- <br />dance with the Contract Documents. However, the Architect <br />sh:ll not be required to make exhaustive or coniinuous on-site <br />inspections [o check the quality or quantity of the Work. On <br />the basis of on-site obsen-acions as an archicect, the Architeci <br />shall keep the Owner informed of the progress und quality of <br />the \t'lork, and shafl endeavor to guard the O,?vner againsc <br />defeccs and deficiencies in the Work. (More exlensir.•e site <br />representcrtiort may be agreed to as an Additiona! Service, as <br />desu•ibed in Puragrapb 3.2.) <br />2.6.6 The Architect shall not have control over or charge of <br />and sh:ill not be responsible for construction means, methods, <br />techniques, sequences or procedures, or for safety precautions <br />and programs in conneccion n•ith the Work, since [hese are <br />solely che ConLrac[or's responsibility under the Con[ract for <br />Conscruccion. The Archicecz sh:ill not be responsible for the <br />Concractor's schedules or f. ?.iure co carry out the \Work in accor- <br />d:uice with the Contract Documen[s. The rlrchitecc shall not <br />have control over or charge of acts or omissions of the Concrac- <br />tor, Stibcon[raciors, or their agents or employees, or of any <br />ocher persons perforining porcions of the Work. <br />2.6.7 The :lrchitect shall ac all [imes have access [o the Work <br />wherever it is in prepara[ion or progress. <br />2.6.8 Except as may othe;-i-ise be provided in (he Contract <br />Documents br when direr communicacions have been spe- <br />ciallyauthorized, the Owne, and Contractor shall communicate <br />through the Archi[ect. Communications b), and n-ith the Archi- <br />[ect's consultants shall be ?nrough the Archi[ect. <br />2.6.9 Based on the Archicect's observations and evaluations of <br />the Contractor's Applications for Payment, the Archirect shall <br />review anci cercify the amouncs due the Contractor. <br />2.6.10 The Architect's cer._ficaLion for payment: shall consti- <br />tute a representacion to the Owner, based on the Architect's <br />observations at the site as p:ovided in Subparagraph 2.6.5 and <br />on tlie daca comprising the Contractor's Application for Pay- <br />ment, that the Work has progressed to the point indicated and <br />that, to the best of the Archicect's knowledge, information and <br />belief, qualitv of the Work u in accordance with the Contract <br />Documents. The foregoing representa[ions are suhject to an <br />ev:iluacion oP the Work for conformance wi[h the Contract <br />Docu,nen[s upon SuUstanEial Completion, co results of subse- <br />quent tests and inspections, to minor deviations from the Con- <br />cract Documents correctab[e prior to completion and to spe- <br />cific qualiFications espressed Dy the Architect. The issuaiice of a <br />Certificate for Payment shalt further constitute a representation <br />chat the Coiuractor is entided ro payment in the amount certi- <br />ed. Honrever, d1e issuance of a Certificate for Payment shall <br />ot be a representation [hai che Architect has (1) made exhaus- <br />tive or continuous on-site fnspections [o check the quality or <br />quantity of the Work, (2) reviewed construction mcans, meth- <br />ocis, techniques, sequences or proce:dures, (3) reviewed copics <br />of requisiEions received from Subconiractors and material sup- <br />pliers and o[her daca requesred by the Owner to substantiate <br />the Contractor's righc to pa} menc or (4) ascertained how or for <br />what purpose the Contractor has used money previously paid <br />on account of the ContracL Sum. <br />2.6.11 The Archicect shali have auchority to reject Work ?vhicfl <br />cloes no[ conform to the Contract Documents. Whenever the <br />Architecc considers i[ necessary or advisable for implementa- <br />tion of the intent of the Contrac[ Documencs, the rlrchicecc will <br />have au[hority to require addi[ional inspec[ion or [esting of the <br />Work in accordance with the provisions of the Contract Docu- <br />ments, R•hether or not such Work is fabricated, ins[:illed or <br />completed. However, neither this authoritv of che Arciliiect nor <br />a decision made in good faith either [o esercise or iior to exer- <br />cise such authority shall give rise ro a du[v or responsibili[y of <br />the Architect to the Concraccor, Subcontrac[ors, materi:il and <br />equipment suppliers, their agents or employees or odier per- <br />sons performing portions of the Work. <br />2.6.12 The Archi[ect shall review and approve or tahe other <br />appropriate action upon Contraccor's submittals suctt :is Shop <br />Dra,wings, Product Data and Samples, bu[ only for the limited <br />purpose of checking for conFormance wich information given <br />and the design concept espressed in the Contract Documents. <br />The Archicect's action shall be taken vvi[h such reasonable <br />promptness as to cause no delay in the \Vork or in the con- <br />struction of the Owner or of separate contractors, while allow- <br />ing sufFicienc time in the Architect's profession:il judgment to <br />permit adequate review. Revien• of such submitt:ils is not con- <br />ducted for the purpose of determining the accuracy and com- <br />pleteness of other de[ails such as dimensions and quantities or <br />for subsEantiacing inscruccions for installation or performance of <br />equipment or systems designed by the Contractor, atl of n•hich <br />remain the responsibilit}- of the Contractor to the esten[ <br />required b}- the Contract Docun-ients. The Architect's review <br />shall not consticute approval of safen• precautions or, unless <br />otherR•ise specifically s[aced by the rlrchitect, of construction <br />means, me[hods, recliniques, sequences or procedures. The <br />Architecrs approval oP a specitic item shall not indicate <br />approval of an a.ssembl}• of R%hich the item is a componen[. <br />When professional cercification of performance charac[eriscics <br />of materials, sysrems or equipment is required by che Contract <br />Documents, the Architect shall be entided Eo relp upon such <br />cer[iFication to establish that the marerials, s}rstems or equip- <br />ment will meet the performance cri[eria required by [he Con- <br />[ract Documen[s. <br />2.6.13 The Architect shall prepare Change Orders and Con- <br />scruction Change Directives, n•i[h supporting documentation <br />and da[a if deemed necessary bv che Archi[ect as provided in <br />Subparagraphs 3.1.1 and 3.3.3, for the Owner's :ipproval and <br />execucion in accordance wich the Contract Documents, and <br />may authorize minor changes in the Work not involving an <br />adjustment in the Contract Sum or an estension of the Contract <br />Time which are not inconsiscent wi[h ihe intent of the Con[ract <br />Documencs. <br />2.6.14 The Architect shall conduct inspec[ions to determine <br />the dace or dates of Substantial Completion and the date of Final <br />comple[ion, shall receive and forn?ard to the Owner for the <br />Owner's review and records n•ricten warran[ies and related <br />documencs required by the Contract Documents and assem- <br />blecl by the Contractor, and shall issue a final Certifica[e for Pay- <br />ment upon compliance ?vith the requirements of the Contract <br />Documencs. <br />AIA DOCUMENT 8141 • OWNER-ARCHITECT AGREEMENT • FOURTEENTH EDITIOiV ^ AIAO •@1987 <br />3 B141-1987 THE AbfERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORKAVENUE, N.W., V%ASHINGTON, D.C. 20006 <br />