Laserfiche WebLink
TERMS AND CONDITIONS OF AGREEiV1ENT BETWEEN OWNER AND ARCHITECT <br />ARTICLE 1 <br />ARCHITECT'S RESPONSIBILITIES <br />1.1 ARCHITECT'S SERVICES <br />1.1.1 The Architect's services consist of those services per- <br />formed by the Architect, Architect's emplo}'ees and Architect's <br />consultants as enumeraced in Ar[ides 2 and 3 oF this Agreement <br />and anv other services included in Article 12. <br />1.1.2 The Architecc's services sh:ill be performed as espedi- <br />tiously as is consistent 'With professional skill and care and the <br />orderly progress of the \vork. Upon request oF Che Owner, the <br />Architect shall submit for the Owner's approval a schedule for <br />the perFormance of Lhe Archirecc's services cvhich may be <br />adjusted as the Project proceects, and shall indude allowances <br />For periods of time required for the Owner's review and for <br />approval of submissions by authorities having jurisdiction over <br />the Prniect Time limits esui.h!?shPd b}, !his SChe:{llle 1p(Jroved <br />by the O,?vner shall not, excep[ for reason:iUle caiue, be exceeded <br />by the Architect or Owner. <br />1.1.3 The services covered by this Agreement are subjec[ to <br />the [ime limiiations contained in Subparagraph 11.5.1. <br />ARTICLE 2 <br />SCOPE OF ARCHITECT'S BASIC SERVICES <br />2.1 DtFINITION <br />2.1.1 The Architect's B:uic Services cotisist of those clescribed <br />in Paragraphs 2.2 through 2.6 and any o[her services identified <br />in Article 12 as part of Basic Services, and include normal s[ruc- <br />tural, mechanical and elec[rical engineering services. <br />2.2 SCHEMATIC DESIGN PHASE <br />2.2.1 The Architect shall review the program furnished by the <br />Owner Lo ascertain the requirements of the Project and shall <br />arrive at a mutual understanding of such requiremen[s with the <br />Owner. <br />2.2.2 The Architect shall provide a preliminary evaluation of <br />the Owner's program, schedule and construction budget <br />requirements, each in [erms of the other, subject to the limita- <br />tions set fortli in Subparagraph 5.2.1. <br />2.2.3 The Architect shall review wid1 the Owner alternative <br />approaches to design and cons[rucEion of the Projec[. <br />2.2.4 Based on the mutually agreed-upon program, schedule <br />and construccion budget requirements, the Architect shall <br />prepare, for approval by the Owner, Schema[ic Design Docu- <br />ments consisting of drawings and other documen[s illustrating <br />the sc:ile :und relationship of Project componen[s. <br />2.2.5 The Architec[ shall submit to the Owner a preliminary <br />estimaCe of Construction Cost based on current area, volume or <br />ocher uni[ costs. <br />2.3 DESIGN DEVELOPMENT PHASE <br />2.3.1 B:ised on the approvect Schemacic Design Documents <br />and any adjustments authorized by the Owner in the progr:un, <br />schedule or conscruction budget, the Architect shall prepare, <br />for approval by the O\vner, Design Development Documcnts <br />consisting of drawings and otiier documents to fix and describe <br />the size and character of the Projec[ as ro architectural, su-uc- <br />[ur:il, mechanical and elec[rical sys[ems, matericils and such <br />other elemenCS :;s mav be appropriate. <br />2.3.2 The Archicect shall advise the Owner of any adjustments <br />Lo the preliminary escimace of Construction Cost. <br />2.4 ,CONSTRUCTION DOCUMENTS PHASE <br />2.4:1 Based on the approved Design Development Docu- <br />ments and any further adjustments in the scope or qu:ility of <br />the Projec[ or in the construccion budget au[horized by the <br />O,?vner, ihe Architect shall prepare, for approval by the O??ner, <br />Construction Documents consisting of Drawings and Specifica- <br />tions setting forth in detail the requirements for the construc- <br />[ion of the Project. <br />2.4.2 The Archirect shall assis< the Owner in the preparation of <br />che necessary bidding information, bidding forms, the Condi- <br />tions of the Contract, and ihe form of AgreemenL between the <br />O,,;%-ner and Contractor. <br />2.4.3 The Architect shall advise the Owner of any adjustments <br />[o previous preliminar}• estimates of Conscruction Cost indi- <br />cated by changes in requirements or general market condi;ion5. <br />2.4.4 Th.. Architec[ shall assist the Owner in connection wich <br />the Owner's responsibilicy Eor :,,ing documents required for <br />the approval of governmental authorities having jurisdiction <br />over the Project. <br />2.5 BIDDING OR NEGOTIATION PHASE <br />2.5.1 The Archicect, follo,?ving the Owner's approval of the <br />Construc[ion Documents and of the la[est preliminary estimate <br />of Construction Cost, shall assist the Owner in obtaining bids <br />or negotiated proposals and assist in awarding and preparing <br />coniraccs for construction. ' <br />2.6 CONSTRUCTION PHASE-ADMINISTRATION <br />OF THE CONSTRUCTION CONTRACT <br />2.6.1 The Architect's responsibility to provide Basic Services <br />for the Construction Phase under [his Agreement commences <br />with the award of the Contract for Construction and terminates <br />ac the earlier of the issuance to the Owner of the Final Certificate <br />for Payment or 60 days after the date of Subscantial Completion <br />of the Work, unless extended under the terms of Subparagraph <br />10.3.3. <br />2.6.2 The Architect sh:dl provide adminiscration of the Con- <br />[raci for Construction as set forth below and in the edition of <br />AIA Document A201, General Conditions of the Concract for <br />Construction, curren[ as of the dace oF this Agreemen[, unless <br />o[herwise provided in this Agreement. <br />2.6.3 Duties, responsibilicies and limitations of authoriry of the <br />Archi[ect shall not be restricted, modified or extended without <br />written agreement of the Owner and Architect with consent of <br />the Contracror, which consent shall not be unreasonably <br />withheld. <br />AIA DOCUMENT 8141 • OW\ER-ARCHITECT r\GREEMENT • FOURTGENT'H EDITION • AIAm •@1987 <br />TFIE AMERIC:\N INSTITUTE OF ARCHITGCTS, 1735 tiEW YORK AVENUE, N.W., WASHI\GTON, D.C. 20006 6141-1987 2