My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993 003 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
1993 Ordinances
>
1993 003 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:01:23 PM
Creation date
8/27/2018 4:48:27 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
003
Year
1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
p) "Run-off" means the part of precipitation which flows over <br />land without filtering in to the soil. <br />q} "Undisturbed" means that portion of the parcel to be <br />developed which will not be regraded, have any vegetation <br />removed from or have any impervious surface constructed on <br />or over as specified in this Chapter. <br />1175.03 PROCEDURES <br />Upon the filing of a request for approval of a building permit, <br />grade plan approval, or subdivision, the Village Chief <br />Administrative Officer shall use the following procedures to <br />determine whether the proposed action is governed by provisions <br />of this Chapter and whether a Hillside Protection Permit shall <br />be required for a parcel or part of a parts], <br />a) The average percent slope shal] be calculated and this <br />information shall be supplied by the applicant at the time <br />of filing of the application with the municipality. <br />b) The application shall be reviewed by the Village Engineer <br />who shall then notify the Village Chief Administrative <br />Officer if a Hillside Protection Permit shall be required. <br />c} If a Hillside Protection Permit is required, the <br />owner/developer shall be required to include hillside <br />control measures with grading, hydrological and <br />landscaping plans as specified in Section 1165.05. <br />These plans shall be submitted to the Village Engineer far <br />approval, <br />d) If it is determined by the Village Chief Administrative <br />Officer that the action is governed by these provisions, <br />then a Hillside Protection Permit shall be required before <br />a Building Permit or Subdivision Permit shall be issued to <br />the owner or developer by the Village A Hillside <br />Protection Permit shall be issued in phases as determined <br />by the Village Chief Administrative Officer and the <br />Village Engineer before the next phase permit will be <br />issued. <br />e) The Planning and Zoning Commission shall have the <br />authority to request the developer to modify the hillside <br />protection plans and preliminary plat plans in hillside <br />areas to better meet the standards and control measures of <br />this Chapter, to protect the health and welfare of the <br />adjacent property owners, and to protect the surrounding <br />hillside and its natural topography. <br />
The URL can be used to link to this page
Your browser does not support the video tag.