Laserfiche WebLink
1309.05 BUILDING CODE ° 14 <br />(5) For each four feet of continuous neon tubing $.50 <br />(6) For each motor 5.00 <br />(7) For each heating outlet 5.00 <br />(8) Illuminating signs 15.00 <br /> <br />(9) <br />Panel boards 10.00 . <br />(10) Intrusion and smoke/fire detection systems 25.00 <br />(e) Heatin g and Air Conditioning Permits. <br />(1) New heating system in multi-family/commercial $ 60.00 <br />(2) Replacement of central heating system 35.00 <br />(3) Installation of unit or space heater 35.00 <br />(4) Air conditioning system 35.00 + <br /> $ 3.00 per ton or fraction thereof <br /> Split systems are treated as two separate systems <br />(5) Solar or geothermal system 50.00 <br />( fl Certificate of Occupancy. <br />(1) Residential single and two-family dwellings -0- <br />(2) Commercial - new buildings 10.00 <br />(3) Commercial - change of tenant 10.00 <br />(4) Multi-family annual certificate of occupancy and <br /> inspection fee - per suite 10.00 . <br />(g) Miscellaneous Permits. <br />(1) Siding $ 25.00 <br />(2) Foundation waterproofing 25.00 <br />(3) Gutters/downspouts 25.00 , <br />(4) Roofing 25.00 <br />(5) Contractor registration for service provided . <br /> to a resident 25.00 <br />(6) Construction trailers - per calendar day 1.00 <br />(7) Removal of trees (Chapter 1359) 10.00 <br />(8) Soil removal (Chapter 1371) 50.00 <br /> Per acre or fraction thereof <br />(9) Recreation vehicles 5.00 <br />(10) Driveway - new 35.00 <br />(11) Driveway - alteration - repairs ' 15.00 <br />(12) On grade concrete, brick, stone patio 20.00 <br />(13) Landscaping 25.00 <br />(14) Sidewalk or apron 10.00 <br />(15) Fire suppression systems - new or alterations 50.00 + <br />(16) Exhaust hood/make up air systems <br />(17) Exhaust hood suppression systems <br />(18) Garage sale <br />(19) Signs - per face <br />(20) Additional inspections <br />(21) Temporary signs <br />(22) Political sign deposit <br />(23) For all structures and construction <br />not specifically listed herein. <br />(Ord. 2005-55. Passed 12-19-05.) <br />1.00 per head <br />25.00 <br />25.00 <br />5.00 <br />25.00 <br />10.00 <br />2.00 <br />100.00 <br />lh of 1% of the value of the <br />construction, but in no event <br />shall such fee be less than <br />20.00 <br />? 2006 Replacement