My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997 045 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
1997 Ordinances
>
1997 045 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:04:51 PM
Creation date
9/4/2018 9:13:29 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
045
Date
11/10/1997
Year
1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.14 Svstem Upgrade Schedule <br />(1) The Permittee shall comply with the requirements of the System. upgrade schedule to <br />be contained in Exhibit C, attached hereto and expressly made a part hereof by reference, of this <br />Permit. <br />(2) No less than thirty (30) days prior to the start of construction in the serving area, the <br />Permittee shall meet all applicable design and construction standards of the Village and shall provide <br />a detailed construction progress schedule, area construction maps, and all other required information. <br />In addition, the Permittee shall update this information upon request by Village on a quarterly basis, <br />by submitting a copy of its normal internal progress reports, showing specifically whether schedules <br />are being met and the reasons for any delay. <br />3.15 Installation of New Svstem Underground <br />All new or upgrade System Facilities shall be installed underground where existing <br />undergrounded Utility Facilities exist, but may be installed on existing Utility poles where aerial <br />Facilities currently exist, if permitted by the Village. In areas where no poles exist, Permittee shall <br />place its Facilities underground, and Permittee shall move existing Facilities underground whenever <br />all other Utilities go underground, or if Permittee upgrades its System Facilities. <br />3.16 Prewiring <br />Any law of the Village which requires prewiring of subdivisions or other developments for <br />electrical and telephone service shall be construed to include wiring for Telecommunications Systems. <br />3.17 Undergrounding of Multiple-Dwelling Units <br />In cases of single site multiple-dwelling units, the Permittee shall minimize the number of <br />individual aerial drop cables by installing multiple drop cables underground between the pole or <br />underground junction box and dwelling unit where determined to be technologically feasible in <br />agreement with the owners and/or owner's association of the multiple-dwelling units. This Section <br />shall apply only to newly constructed buildings or unwired existing buildings. Permittee shall be <br />required to install drop cables only if all other Utilities are required to do the same at the time of <br />installation. <br />3.18 Rights-of-Way Occupancy <br />(1) In any case where Permittee has the required written permission from the Village not <br />to underground its System Facilities, the Permittee shall utilize existing poles, conduits and other <br />Facilities whenever possible and economically feasible, and may not construct or install any new, <br />different or additional poles, conduits or other Facilities on public property until the written approval <br />of the Village is obtained. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.