Laserfiche WebLink
The facility's storage capacity shall be sixty-seven (67) <br />cubic yards per acre of drainage area. A sediment basin <br />shall be the required facility if the size of the denuded <br />area contributing runoff exceeds five (5) acres. <br />(d) Perimeter Controls. Sheet flow runoff from denuded. areas <br />shall be filtered or diverted to a settling facility. <br />Perimeter controls such as sediment filters or diversions <br />to settling facilities shall protect adjacent properties <br />and waters of the Village of Mayfield and the State from. <br />sediment transported by sheet flow. <br />(e) Storm Sewer Inlet Protection. All storm sewer inlets <br />which accept water runoff from the development area shall <br />be protected so that. sediment laden water will not enter <br />the storm sewer system without first being filtered or <br />otherwise treated to remove sediment. <br />(f) Working in or Crossing Streams. <br />(1) Streams including bed and banks shall be <br />reestablished immediately after in-channel. work is <br />completed, interrupted, or stopped. <br />To the extent practicable, construction vehicles <br />shall be kept out of streams. Where in-channel work <br />is necessary, precautions shall be taken to stabi- <br />lize the work area during construction to minimize <br />erosion. <br />(2) If a live (wet) stream. must be crossed by <br />construction vehicles regularly during construction, <br />a temporary stream crossing. shall be provided. <br />(g) Construction Access Routes. Measures shall. be taken to <br />prevent soil transport by vehicle tracking onto surfaces <br />where runoff is not checked by sediment controls, or onto <br />public roads. <br />If soil is transported onto public road surface, the <br />roads shall. be cleaned thoroughly at the. end of each day, <br />or more frequently if public safety dictates. Soil shall <br />be removed from paved surfaces by shoveling or sweeping. <br />Street washing shall be utilized only after soil has been <br />removed by shoveling or sweeping. <br />(h) Underground Utility Construction. The construction of <br />underground utility lines shall. be subject to the <br />following. criteria: <br />(a) Trenches shall remain open. for no more than five (5) <br />days. <br />