My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991 041 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
1991 Ordinances
>
1991 041 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:06:09 PM
Creation date
9/5/2018 9:05:24 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
041
Date
8/19/1991
Year
1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-r-21 <br />(2-s7)' <br />OHIO DEPART'IVIIENT OF TRANSPORTAI'IQN <br />APPLIcATIoN <br />FOR PERMISSION TO INSTe4LL/MODIFY AR1D OPERA?TE <br />A TRAFFIC CONTROL SI(aNAL <br />Date <br />To: Engineer of Traffic <br />c/o District Deputy Director <br />District 12 <br />5500 Transportation Blvd. <br />Garfield Hts., Ohio 44125 <br />In accordance with the provisions of Sections 4511.10, and .11, Ohio Revised Code, the incorporated Village of <br />Mavf ield does hereby request authority to install/modify and operate a traffic control signai at the <br />intersection of The Outerbelt East Street (State Route T 271 NB ) and Wi 1 Gon Mi 1 1'; Street <br />County Road <br />The enclosed traffic engineering study performed by ODOT 12 <br />and dated 01/13/86 indicates that the proposed signal is justified by warrant(s) 1 . <br />This application is made with the understanding that; if approved by you, the signal will comply with the requirements <br />as stipulated by law. <br />Village of Mavf ield <br />Councy of Cuyahoga <br />(Signature of Elected Official) <br />TRAFFIC CONTFiOL SIGNAL <br />Al1THOR IZ/4T10N <br />To: Village of <br />You are hereby authorized to install/modify a traffic control signal at this intersection. This is subject to approval, by the <br />Ohio Department of Transportation, of the Village prepared operation plan (sample attached) with the understanding that <br />the traffic control signal will comply with the requirements of the Ohio Manual of Uniform Traffic Control Devices. <br />The Operation Plan should be aubmltted es aoon es poeslble because thls authorlaatlon <br />will au4omaQically expfre 180 daya from the date Isaued unlesa otherwlse eatended by the <br />Ohio Department of Transportatlon at the request of the Vltlage. <br />Date <br />Engineer of Traffic
The URL can be used to link to this page
Your browser does not support the video tag.