My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991 041 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
1991 Ordinances
>
1991 041 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:06:09 PM
Creation date
9/5/2018 9:05:24 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
041
Date
8/19/1991
Year
1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
T-zi _ <br />cz-s71- <br />OHIO DEPARTMENT OF TRANSPORTATION <br />APPLICATION <br />FOR PERMISSION TO INSTALL/MODIFY AND OPERATE <br />A TRAFFIC CONTROL SIGNAL <br />Date <br />To: Engineer of Traffic <br />c/o District Deputy Director <br />District 12 <br />5500 Transportation Blvd. <br />Garfield Hts.. Ohio 44125 <br />In accordance with the provisions of Sections 4511.10, and .11, Ohio Revised Code, the incorporated Village of <br />Mayf ield does hereby request authority to install/modify and operate a traffic control sig nal at the <br />intersection of The Outerbelt East Street (State Route I 271 SB ? and Wilson Mills Street <br />(Seax?lriscorac 71 County Road ODOT 12 <br />The enclosed traffic engineering study performed by <br />and dated 01/13/86 indicates that the proposed signal is justified by warrant(s) 1 . <br />This application is made with the understanding that, if approved by you, the signal will comply with the requirements <br />as stipulated by law. <br />village of Mayfield <br />County of Cuyahoga <br />(Signature of Elected Official) <br />TRAFFIC CONTROL SIGNAL <br />AUTHORIZATION <br />To: Village of <br />You are hereby authorized to install/modify a traffic control signal at this intersection. This is subject to approval, by the <br />Ohio Department of Transportation, of the Village prepared operation plan (sample attached) with the understanding that <br />the traffic control signal will comply with the requirements of the Ohio Manual of Uniform Traffic Control Devices. <br />The Operadon Plan should be submltted as aoon aa possible because thls authorizeHon <br />wlll automaHcally explre 180 days from the date Issued unlesm otherwlse extended by the <br />Ohlo Department of Transportatlon at the request ot the Villaye. <br />Date <br />Engineer of Traffic
The URL can be used to link to this page
Your browser does not support the video tag.