Laserfiche WebLink
1128.06 APPLICATION PROCEDURES <br />A. Pre-Application Meeting: The applicant shall attend aPre-Application Meeting with the <br />Mayfield Village Engineer to discuss the proposed project, review the requirements of this <br />regulation, identify unique aspects of the project that must be addressed during the review <br />process, and establish a preliminary review and approval schedule. <br />B. Preliminary Comprehensive Storm Water Management Plan: The applicant shall submit <br />two (2) sets of a Preliminary Comprehensive Storm Water Management Plan (Preliminary <br />Plan), Calculations and the applicable fees to the Mayfield Village Building Department. <br />The Preliminary Plan shall show the proposed property boundaries, setbacks, dedicated <br />open space, public roads, water resources, storm water control facilities, and easements in <br />sufficient detail and engineering analysis to allow the Mayfield Village Engineer to <br />determine if the site is laid out in a manner that meets the intent of this regulation and if the <br />proposed storm water management practices are capable of controlling runoff from the site <br />in compliance with this regulation. The applicant shall submit two (2) sets of the <br />Preliminary Plan and applicable fees as follows: <br />1. For subdivisions: In conjunction with the submission of the preliminary subdivision <br />plan. <br />2. For other construction projects: In conjunction with the application for a zoning <br />permit. <br />For general clearingprojects: In conjunction with the application for a zoning <br />permit. <br />C. Final Comprehensive Storm Water Management Plan: The applicant shall submit two (2) <br />sets of a Final Comprehensive Storm Water Management Plan (Final Plan), Calculations <br />and the applicable fees to the Mayfield Village Building Department in conjunction with <br />the submittal of the final plat, improvement plans, or application for a building or zoning <br />permit for the site. The Final Plan shall meet the requirements of Section 08 and <br />shall be approved by the Mayfield Village <br />Engineer prior to approval of the final plat and/or before issuance of a building permit by <br />the Building Inspector. <br />D. Review and Comment: The Mayfield Village Engineer shall review the Preliminary and <br />Final Plans submitted, and shall approve or return for revisions with comments and <br />recommendations for revisions. A Preliminary or Fuial Plan rejected because of <br />deficiencies shall receive a narrative report stating specific problems and the procedures for <br />filing a revised Preliminary or Final Plan. <br />E. Approval Necessary: Land clearing and soil-disturbing activities shall not begin and zoning <br />and/or building permits shall not be issued without an approved Comprehensive Storm <br />Water Management Plan. <br />F. Valid for Two Years: Approvals issued in accordance with this regulation shall remain valid <br />for two (2) years from the date of approval. <br />1128.07 COMPLIANCE WITH STATE AND FEDERAL REGULATIONS <br />