Laserfiche WebLink
Zoning Inspector. <br />(2) For other construction projects: Before issuance of a zoning permit by the Zoning <br />Inspector. <br />(3) For general clearing projects: Prior to issuance of a zoning permit by the Zoning <br />Inspector. <br />(b) Mayfield Village shall review the plans submitted under 1129.06 (a) or (b) for conformance <br />with this regulation and approve, or return for revisions with comments and recommendations <br />for revisions. A plan rejected because of deficiencies shall receive a narrative report stating <br />specific problems and the procedures for filing a revised plan. <br />(c) Soil disturbing activities shall not begin and zoning permits shall not be issued without an <br />approved SWP3 or Abbreviated SWP3. <br />(d) SWP3 for individual sublots in a subdivision will not be approved unless the larger common <br />plan of development or sale containing the sublot is in compliance with this regulation. <br />(e) Approvals issued in accordance with this regulation shall remain valid for one (1) year from <br />the date of approval. <br />1129.07 COMPLIANCE WITH STATE AND FEDERAL REGULATIONS <br />Approvals issued in accordance with this regulation do not relieve the applicant of responsibility for obtaining <br />all other necessary permits and/or approvals from the Ohio EPA, the US Army Corps of Engineers, and other <br />federal, state, and/or county agencies. If requirements vary, the most restrictive requirement shall prevail. <br />These permits may include, but are not limited to, those listed below. All submittals required to show proof of <br />compliance with these state and federal regulations shall be submitted with Storm Water Pollution Prevention <br />Plans or Abbreviated Storm Water Pollution Prevention Plans. <br />(a) Ohio EPA NPDES Permits authorizing storm water discharges associated with construction <br />activity or the most current version thereof: Proof of compliance with these requirements shall <br />be the applicant's Notice of Intent (NOI) number from Ohio EPA, a copy of the Ohio EPA <br />Director's Authorization Letter for the NPDES Permit, or a letter from the site owner <br />certifying and explaining why the NPDES Permit is not applicable. <br />(b) Section 401 of the Clean Water Act: Proof of compliance shall be a copy of the Ohio EPA <br />Water Quality Certification application tracking number, public notice, project approval, or a <br />letter from the site owner certifying that a qualified professional has surveyed the site and <br />determined that Section 401 of the Clean Water Act is not applicable. Wetlands, and other <br />waters of the United States, shall be delineated by protocols accepted by the U. S. Army Corps <br />of Engineers at the time an application is made under this regulation. <br />(c) Ohio EPA Isolated Wetland Permit: Proof of compliance shall be a copy of Ohio EPA's <br />Isolated Wetland Permit application tracking number, public notice, project approval, or a <br />letter from the site owner certifying that a qualified professional has surveyed the site and <br />