My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011 033 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2011 Ordinances
>
2011 033 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:07:10 PM
Creation date
9/7/2018 5:55:05 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
033
Date
10/17/2011
Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1391.05 SPECIAL USE PERIVIIT. <br />(a) A special use permit, issued pursuant to Chapter 1149, shall be required for the <br />construction and operation of any Wind Energy Facility. The Planning Commission <br />shall make recommendation to Council and Council may approve such special use <br />provided the applicant demonstrates compliance with the requirements of the laws of <br />the Village. <br />(b) Fees. The applicant shall pay a nonrefundable application fee of Two Hundred <br />($200.00) Dollars to the Planning Commission for an original Wind Energy Facility <br />special use permit or any amendment to an existing Wind Energy Facility special use <br />permit. <br />(c) Any physical modification to an existing special use permit for a Wind Energy <br />Facility that materially alters the size, type and number of wind turbines or other <br />equipment appurtenant thereto shall require a written amendment to the special use <br />permit approved by the Village. <br />(d) Submission Requirements. <br />(1) An application for a special use permit or for an amended special use permit shall <br />be on a form approved by the Building Commissioner and shall contain the <br />following information: <br />(A.) The name, address, email address and telephone number of the applicant. <br />(B.) The name, address email address and telephone number of the owner of <br />the property and the zoning district of the subject property. <br />(C.) A narrative description of the existing use of the property. <br />(D.) An illustrative picture and narrative describing the proposed Wind Energy <br />Facility, including an overview of the project; the project location; the <br />approximate generating capacity of the Wind Energy Facility; the approximate <br />number, representative types and height or range of heights of wind turbines to be <br />constructed, including their generating capacity, dimensions and respective <br />manufacturers, and a description of ancillary facilities. <br />(E.) An affidavit or similar evidence of agreement between the property owner <br />and the facility owner or operator demonstrating that the facility owner or <br />operator has the permission of the property owner to apply for necessary permits <br />for construction and operation of the Wind Energy Facility on the property <br />owner's behalf. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.