|
Has the ground been previously disturbed? ^ Yes ^ No
<br />Please describe previous ground distrubing activities (e g ,parking lot, farming, commercial development,
<br />etc ):
<br />Will any equipment or structures need to be installed? ^ Yes ^ No
<br />If yes, please explain how and where this is proposed to be done (please inclzrde site-specific• photographs, and
<br />attach additional pages, if needed):
<br />Please state the date of• construction of the building(s) or structure(s) (e.g ,bridge) involved in the proposed project: _
<br />Project Type: ^ Other• ground distut•bing activities (i.,e,,; trenching, excavation, etc.)
<br />Project. Location (physical project address or latitude/longitzrde of project location):
<br />Color site photos and other visual documentation (i.e ,maps, technical drawings) attached? ^ Yes ^ No
<br />bVhat type of•ground disturbance is needed and why {i e ,utility trenching, etc• )?
<br />Please give the total extent of ground disturbance required (depth and length): .
<br />Has the ground been previously disturbed? ^ Yes ^ No .
<br />Please describe previous ground disturbing activities (e g.., pazking]ot, farming; commercial development,
<br />etc.):
<br />Will any equipment or• structures need to be installed? ^ Yes ^ No
<br />If yes, please explain how arid where this is proposed to be done (please'inclzrde site-specific photographs, and
<br />attach additional pages, ifneeded)'
<br />Please state the date of construction of the building(s) or structure(s) (e_g_, bridge) involved in the proposed project:
<br />Project Type: ^ Iraining and exercises
<br />Project Location (physical project address or latitude/Jongitude of project location):
<br />Is the training field-based of classroom-based? ^ Field-based ^ Classroom-based
<br />Will field-based training take place at an approved facility (i.e~ existing facilities, with established and approved procedures,
<br />and~that conform with existing land use designations}? ^ Yes ^ No
<br />If training is classroom-based or taking place at an approved facility, no fzrrther information is r•egrrired If field-based and
<br />not at a previously approved facility. please provide the following
<br />Color site photos and other visual documentation (i.e ,maps, technical drawings) attached? ^ Yes ^ No •
<br />Will ground distuz~bance be required to prepare the training site? ^ Yes ^ No
<br />Lf'yes, please give total extent (depth and length):
<br />Has the ground been previously disturbed? ^ Yes ^ No
<br />Please describe previous ground disturbing activities (e..g ,parking lot, farming; commercial development,
<br />etc_):
<br />Will any equipment or structures need to be installed to facilitate training? ^ Yes ^ No
<br />If yes, please explain how and where this is proposed to be done (please include site-specific photographs, and
<br />attach additional pages, if needed):
<br />Please describe the scope of the proposed training (purpose, frequency, facilities/location needed, materials and equipment
<br />needed, number of participants, and type of activities required) (tlttach additional pages, if needed):
<br />Does the training exercise differ in any way (frequency, amount of facilities/land used, materials or equipment used,
<br />number of participants, type of activities, etc.) from previously approved, petmit#ed training exercises and training
<br />practices? ^ Yes ^ No
<br />If'yes, please explain any differences, and the reason for them, in detail (.4itach additional pages, if needed):
<br />Page 39
<br />
|