Laserfiche WebLink
<br />r <br />MELD Mayfield Village Green Corridor Ivlu-z, ferK <br />? ? E <br />. <br />v a - <br /> <br />Table of Contents <br />Introduction p. 2 - 6 <br />Mayfield Village Green Corridor Masterplan p. 54 - 68 <br />`+?,•' " Project Background <br />-? ? • Context Map <br />ProJect PurPose and Need <br />Inventory and Analysis p. T- 32 <br />? <br />? <br />. ? - <br />.Q <br />... ._?..,. <br />Project Area Key Map <br />Ownership Maps, North & South Corridors <br />Land Use Maps, North & South Corridors <br />Natural Systems Maps, North & South Corridors <br />Pedestrian Network Maps, North & South Corridors <br />5 Minute Walk/Bike Ride Analysis <br />Overall Opportunities & Constraints <br />Detailed Opportunities & Constraints of Beecher's Brook <br />Detailed Opportunities & Constraints of Cascade Overlook <br />Detailed Opportunities & Constraints of Cascade Erosion <br />Detailed Opportunities & Constraints of ODOT Property <br />Detailed Opportunities & Constraints ofAmphitheater <br />Detailed Opportunities & Constraints of The Civic Center <br />Safe Routes to School Analysis <br />Photographic Inventory <br />- ? <br />-- ' Alternatives Analysis p. 33 - 53 <br />M?-? i> • Conceptual Trail Plan <br /> Proposed Trail Segment `A' &'B' Plans <br /> ODOT/Panzica Ramp/BoardwalkAlternative <br /> Trail Design Through Existing Parking Alternatives <br /> Beechers Brook Bridges/Ramps Alternatives & Examples <br /> Proposed Trail Segment `C & `D' Plans <br /> Existing and Proposed Trail Comparative Analysis <br /> Trail Enhancements Alternatives <br /> The Civic Center Bioinfiltration Potential Locations <br /> Beechers Brook Erosion / Restoration Alternatives <br />-? Cascade Erosion Control and Slope Stabilization <br /> Overlook Conceptual Plan & Examples <br /> OutdoorAmphitheater Design Precedents <br />_ Outdoor Sculpture Walk Design Precedents <br />Entire Trail System <br />Proposed Green Corridor Masterplan: <br />-Overall Proposed Trail Plan <br />-SegmentA <br />-Segment B <br />-Segment C <br />-Segment D <br />-Segment E <br />-Segment F1 <br />-Segment F2 <br />Detailed Plans: <br />- The Civic Center Bioswales <br />- Beechers Brook Stream Restoration <br />- Cascade Overlook and Erosion Control <br />- Parking Lot Bioswales <br />-Amphitheater Design <br />Implementation p. 68 - 79 <br />Phasing Plan <br />Grant Funding <br />Appendix p. 80 - 85 <br />Appendix A: Trail Design Justification <br />Appendix B: Green Infrastructure & Sewer Fees <br />Appendix C: 2009 Preliminary Costs of Construction <br />-Overall <br />-SegmentA <br />-Segment B <br />-Segment C <br />-Segment D <br />-Segment E <br />-Segment F1 <br />-Segment F2 <br />3