Laserfiche WebLink
` . ` ? . , . ` {i • ? _-' <br />, . <br />? n ?. ? . . Niayf'eld Viltage Green Corridor'?Ivla?stE <br />? . ; a .. <br />. <br />, <br />. ,? <br />? <br />,. . , ? <br />i4ppendix A: Justification of Trail Width <br />The Mayfield Village Greenway <br />Trail is proposed to be a 10' wide <br />asphalt all-purpose trail. The ten <br />foot width is consistent with the <br />existing SOM Center roadside <br />trail as well as other regional <br />Metroparks trail systems. <br />An asphalt pavement surface <br />all-purpose trail is suitable for <br />walking, running, biking, in line <br />skating, wheelchair, as well as <br />emergency or maintenance <br />vehicle use. Asphalt pavement <br />prevents weed growth and will <br />reduce annual maintenance <br />requirements. <br />Construction drawing showing <br />the Som Center Rd. trail was <br />designed as 10' wide. <br />2. ITEM 304-AGGREGATE BASE <br />8. ITEM 448 - 1 3/4" ASPHALT CONCRETE <br />INTERMEDIATE COURSE, TYPE 1, PG64-22 <br />9. ITEM 448 - 1 1/4" ASPHALT CONCRETE <br />SURFACE COURSE, TYPE 1, PG64-22 <br />Photos displaying the existing 10' wide All- <br />Purpose Trail along Som Center Road as <br />ideal for biking, running and other recreational <br />activities. <br />75