Laserfiche WebLink
ade24xtd? bv the Village.A'nLrGn-rrnN rrr cr-r• r?v ??rir crrn'?i?i rr r nr rr;rc <br />n nnn?rrn r?v ?rt_rr (GnrnnnrrniI?,v ri n n,rr.) i? .?. ...? v? v <br />Lej&5 Review and Approval of a Floodplain Development Permit Application_ <br />J_IIA-: Review <br />LA)4-. After receipt of a complete application, the Floodplain Administrator shall <br />review the application to ensure that the standards of these regulations have been <br />met. No floodplain development permit application shall be reviewed until all <br />-.4 has been received by the <br />information required in Section 1 125.03 d3 <br />Floodplain Administrator. <br />QD27 The Floodplain Administrator shall review all floodplain development permit <br />applications to assure that all necessary permits have been received from those <br />federal, state or local governmental agencies from which prior approval is <br />required. The applicant shall be responsible for obtaining such permits as required <br />including permits issued by the U.S. Army Corps of Engineers under Section 10 <br />of the Rivers and Harbors Act and Section 404 of the Clean Water Act, and the <br />Ohio Environmental Protection Agency under Section 401 of the Clean Water <br />Act. <br />JQ$: Approval_ <br />Within thirty (30) days after the receipt of a complete application, the Floodplain <br />Administrator shall either approve or disapprove the application. If an application is <br />approved, a floodplain development permit shall be issued. All floodplain <br />development permits shall be conditional upon the commencement of work within <br />one (1) year. A floodplain development permit shall expire one (1) year after issuance <br />unless the permitted activity has been substantially begun and is thereafter pursued to <br />completion. <br />,(f)3-.6 Inspections, <br />The Floodplain Administrator shall make periodic inspections at appropriate times <br />throughout the period of construction in order to monitor compliance with permit <br />conditions. <br />W3-.7 Post-Construction Certitications Required: <br />The following as-built certifications are required after a floodplain development permit <br />has been issued: <br />?l)?r For new or substantially improved residential structures, or nonresidential <br />structures that have been elevated, the applicant shall have a Federal Emergency <br />Management Agency Elevation Certificate completed by a registered surveyor to <br />record as-built elevation data. For elevated structures in Zone A and Zone AO areas <br />without a base flood elevation, the elevation certificate may be completed by the <br />property owner or owner's representative. <br />13