Laserfiche WebLink
TJRS <br />WORK O12DER NO. 5 <br />S.O.M. CENTER/WHITE ROAD WIDENING <br />DESIGN AND PLAN PREPAl.tATION DUCUMENTS <br />URS ?ORF?RATION/MAY?LD VILLAGlE <br />AGREEMENT DATED FEBRUARY 3,1998 <br />MODIFICATION NO. 9- Dated May 28, 2003 <br />This Work Order Task is being performed as an extension of the Professional Engineering Services <br />Agreement between Mayfield.Village and URS Corpoiation (IJRS), formerly ]rnown as URS <br />Greiner, dated February 3, 1998. All terms and conditions stated therein aze incorporated into this <br />ViVork Order by reference. The Mod No. 9 rnodifications fo the base document are annotated by <br />bold italics font. <br />SCOPE OF SERVICES <br />URS will provide the following specific consulting services to perfozzxi the design and plan <br />preparation documents needed for the widening and reconstruction of S.O.M. Cemer/White Roads. <br />S.O.M. Center Road would be widened to five (5) lanes for an esrimated length of twelve thousand <br />seven hundred (12,700) lineal foot. White Road would be widened to three (3) lanes for an estimated <br />length of twelve hundred (I,200) linea] foot. The work would include six (6) signalized <br />intersections. The design and plan preparation services would be perfortned to be consistent with the <br />new ODOT LocaI PubIic Agency Policy. <br />Alternative Alignment Study: iJRS willprepare.an alignment study for S.O.M. Center <br />Road from White Road to Wilson Mills Road. This alignment study will identify pqtential <br />right of way impacts,_.potential. enuiranrnental 'tmpacts, and potential utility impacts of <br />providing a five lane roadway section throughout the project limits. URS will prepare a <br />preliminary plan the addFesses these eoneems and present it to the Village for approval <br />before proceeding with final design. Additional alignment studies, meeting displays, <br />graphics, and meeting attendance with the Vittage's SOM Widening Coznmittee. . <br />2. Field Survey: Using conventional. methods,. URS will perform field surveys consisting of <br />the following elements: • Establish centerlines of S.O.M..Center Road, Wilson Mills, Highland and White Road <br />? Cross Sections for proper drainage and alignment (every 50') <br />• General topo (hydrattts; eatslr basins, water, traffie, sewer, etc.) <br />• R.ight-of-way delineation - <br />• Bench Marks <br />• Reference Points <br />• Aerial Mapping (Wilson Mills to 1800 ft north of Highland <br />• Field staking proposed right of way per direction of SOM Widening Committee. <br />Bench marks and control points will be established at 800 foot maximum spacing throughout <br />the project. Cross sections wiIl.be taken at.fifly-foot intervals and 100 feet left and right <br />laterally within the stated limits. Topography.will be located within the project limits. Al1 <br />J:1Proj3URlContractilMayfie1d 10-50907.001W05 MOD9.doc 1 <br />i EXHIBIT <br />? <br />a <br />a <br />9