My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003 027 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2003 Ordinances
>
2003 027 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:08:30 PM
Creation date
9/10/2018 4:21:59 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
027
Date
7/14/2003
Year
2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
URS <br />• Draina e Culvert Re lacement Provide plans to replace undersized drainage culverts per stormwater criteria provided <br />by the Village Ehgi?reer. Design access chamber for Beecher's Brook repCacement <br />culverl. <br />• Lightin Plans <br />Provide lighting plans and specifications for underpass lighting of the bikeway <br />underpassea. Revierv proposed CEI lighting plans. <br />• Right-of-Wav Acquisition Plans <br />The plans will identify two hundred (200) parcels and the proposed right-of-way impacts <br />to each parcel by the planned improvements. Develop exhibits to assist in conveydng <br />X/W ampacts to effected property owners. <br />• Notes and Details <br />Notes will be prepared including, specifications, driveway details, intersection details, <br />quantities, etc. <br />• ODOTReview Comments Revise plans to incorporate plaft review comments associated with a higher level of <br />review by 4DOT. . <br />• DeIiverables . <br />URS will provide the following.deliverables.to:Mayfield Village: <br />1) Mylar tracings of the entire design, including specifications, quantities and . <br />calculations. <br />2) An estemate ofprobable construction cost. <br />3) Electronic files of the final.roadway design. <br />4. Utility Coordination: In addition-to basic services such as notification of proposed work to <br />utilities and the plotting of such utilities on the design documents, URS will provide utility <br />coordination services ta assist in confliet zesolution, coordination among utilities during <br />relocation, and advesing the client on utility issues. <br />5. Engineering during constructioK: An allowance of $70,000 is provided for changes during <br />construction, which._eeguir.e detailedengineering support. Such allowance sfiall only be <br />uti[ized by specifu diredion of the ?llage. <br />ESTIMATED COST <br />The total work order costs willb.e based on only the actual labor hours and reimbursable expenses <br />expended on the Project. URS' compensation for this Work Order will not exceed the authorized <br />amount of One Million, FijiyNine Thousand ($1,059,000) Dollars without further written approval <br />from the Client. <br />J_1Proj3UR\Contracis\MayField 10-50907.001W05 MOD9.doc 3
The URL can be used to link to this page
Your browser does not support the video tag.