Laserfiche WebLink
01/18/01 12:38 FAX 440 481 7349 <br />? <br />Dccember 13, 2000 <br />MAYOR'S OFFICE ? LAtiV DYR Cpj002 <br />Mr. Philip M. Brett <br />'Director of Finance and Economic I)evelopment <br />Mayfield Village <br />6621 Wilson Mills Road <br />Mayfield Village, Ohio 44143 <br />Yte: Nlod'efication ltequest for Professional Services Agreeniient <br />for the Noe'th Cltagren Commonq Development I SO1V1,Ccnter <br />'kioad VVedening - Modifacation No. 6 <br />Dear Mi. $rett: <br />Please find enclosed herewith, two (2) sigiied originals of our proposed modifcations to our <br />professionfll engineering services agreement for the 1Vorth Chagriii Coinmons Development and <br />widening of SOM Center and White Roads. The ModiCcation Nu G revisions to our existing <br />a,greement da9:ed February 6, 1998 reflect additional scrvices to be pcrformed in associat;ion with the <br />SOM Center Road W idening and to provide a water system loop the Progressive Campus. <br />The specific revisions to each respeetive Worlc Order previously r pproved and the new work being <br />proposed are as follows: <br />? Worflc Order No. 5- S.O.M. Center/Whitc Road Wadenin;, Design and Plan Preparataon <br />Documents; The scope of work is being revised to provide for additional design services for <br />suect lighCing, thc 16" water line rcplaeeinent, twro (2) bilcewiiy undetpass structures, and <br />additional miscellaneous services associated with scope de•rel:)pment including aligruncnt <br />studies and public meeting atcendaiice. <br />? Work Order No. 13 - dVater System Loop To Tbe Progres,y'rve Campus; This is a new work <br />order to provide design serveees and canstruction plans to pro-,ride a watcr system loop for <br />i-edundancy to tlie Progressive Campus. <br />The following taUle represeirts a summary of the worl: orders to d ite and a9sociated compensation. <br />URS Corporatlon <br />564 White Pond Drive <br />ANron, OH d4320-1100 <br />Tel: 330.836.9111 <br />Fax: 330.836.9115 <br />t?`? ??