Laserfiche WebLink
? ? - <br />WORK ORDER NO. 6 <br />S.O.M. CENTER/WHITE ROAD WIDENING <br />BIDDING AND CONSTRUCTION ASSISTANCE <br />URS CORPORATION/MAYFIELD VILLAGE <br />AGREEMENT DATED FEBRUARY 3,1998 <br />MODIFICATION NO. 7- Dated November 29, 2001 <br />This Work Order Task is being performed as an extension of the Professional Engineering Services <br />Agreement between Mayfield Village and URS Corporation (URS), formerly known as URS <br />Greiner, dated February 3, 1998. All terms and conditions stated- therein are incorporated into this <br />Work Order by reference. The MOD No. 7 modifications to the base document, which was <br />previously approved by the Clienf, are annotated by bold italics font. Resident Inspection services <br />were moved to Work Order No. 7 and incorporated therein as part of Modification No. 1. <br />SCOPE OF SERVICES <br />This Work Order provides for bidding and construction administration services during the <br />construction of the widening and reconstruction of S.O.M. Center/White Roads under two (2) <br />separate construction contracts. The initial contract for construction of a waterline and c[earing <br />and grubbing for utility relocation shall be six (6) months in duration. The second contract for the <br />construction of S.O.M. Center Road shall be twentyfour (24) months in duration. S.O.M. Center <br />Road would be widened to five (5) lanes for an estimated length of twelve thousand seven hundred <br />(12,700) lineal foot. White Road would be widened to three (3) lanes for an estimated length of <br />twelve hundred (1,200) lineal foot. The design, plan preparation, and construction phase services <br />would be performed to be consistent with the new ODOT Local Public Agency Policy. <br />URS will provide the following specific consulting services in assisting the Client during the bidding <br />and construction phases of the project: <br />Basic Services During Bidding Phase: The Bidding Phase will commence upon the approval by <br />the Client of the Contract Drawings and Project Manual and will terminate upon URS furnishing the <br />Client with an engineering recommendation concerning the awarding of the construction contract. <br />URS' services during the Bidding Phase shall consist of the following: <br />URS shall issue on behalf of the Client up to 40 sets of Drawings and Project Manuals to <br />interested Contractors and equipment and materials suppliers upon their request and maintain <br />records of the bidders list. URS shall be entitled to charge the Contractor's, suppliers and <br />other interested parties a reasonable fee for purchase of the Drawings and Project Manuals <br />ancl will retain such fee as additional compensation. <br />2. URS shall place copies of the Drawings and Project Manual on view in URS' Cleveland <br />office, F.W. Dodge offices, and others as necessary for information of Contractors and <br />equipment arid material suppliers; and be available for interviews with prospective bidders <br />during period of advertisement for construction bids. <br />, <br />\\S030NWO1\PROJ11Proj3\.TR\Contracts\Mayfield 10-50907.00\W06_MOD7.doc <br />l