Laserfiche WebLink
RESOLUTION NO. 2000- 09 <br />Page 3 <br />Minimum Fees - Schedule 2 <br />Cost of Construction: <br />$100,000 - <br />$100,000 - $500,000 <br />$500,000 - $1,000,000 <br />9% <br />Base Fee of 9% of $100,000 <br />Plus 6% of amount over $100,000 <br />Base Fee of 6.6% of $500,000 <br />(c) If, after the plans, profiles, specifications and estimates of costs for work <br />authorized and approved by the Council have been prepared by the Engineer, the <br />proceedings for such work is abandoned or is postponed for a period of more than six (6) <br />months, or the actual construction of such work is not commenced within nine (9) months <br />after the date of delivery of said plans, profiles, specifications and estimates of costs, then <br />he shall be paid forthwith a sum equal to 75 percent of the fee stated in Section 3(b), based <br />on the total estimated cost of said improvements, as full compensation for all work done <br />up to that date upon the subject project. In the event the proceedings for such work so <br />abandoned, or postponed, is revived and actively pursued by the Village, he shall perform <br />the balance of the services to be rendered under this Agreement and not previously <br />performed, and he shall credit against the total compensation due any payments made <br />under Section 3(c). <br />(d) The fee provided in Section 3(b) hereof shall cover engineering services <br />including preliminary estimates and reports, complete detailed plans and specifications, <br />preparation of monthly and final estimates for contractor payments. The above schedule <br />of fees does not include property, topographic, boundary or right-of-way surveys, lines and <br />grade stakes, resident engineer, inspection of materials, cost of test borings, or other sub- <br />surface explorations, or calculation of special assessments. These latter services may be <br />provided by the Engineer on an hourly basis in accordance with the schedule of rates <br />hereinafter set forth in Section 3(e). <br />(e) For all engineering services in connection with any and all public improvements <br />constructed by the Village in cooperation with any federal or state agency, or work not let <br />by contract, or for special surveys, reports, etc., or for the preparation of special <br />assessments and for any and all services not specified above nor incident to nor connected <br />with the construction of public improvements, subject to the terms of Section 3(f), <br />compensation shall be made on the basis of time spent by him or his employees and <br />associates at the rates set forth in the following schedule of hourly rates.