Laserfiche WebLink
NOV-08-1999 1516 - ~BRANIISTETrER_CW~ROLL <br />Subtotal <br />7. Pergola Column Deletion <br />Masonry (Exti'a material to Owner) <br />(2,200.00) <br />Concrete Footers <br />Stone Caps <br />Subbo~l <br />8. Fencing <br />Add two gates <br />.Add fence around diving well . <br />Care drill in diving well concrete <br />Subtotal - <br />9. Steel <br />_ Plates -lintels, rotunda revision <br />10. Carpentry <br />Cedar at rotunda <br />Material in rotunda <br />. Revisions to door hardware <br />Subtotal <br />11. Cabinetry <br />Counter deletion .. . <br />12. Metal Siding <br />Credit for rotunda <br />Credit for siding revision <br />Subtotal <br />13. Lockers - <br />Addi~ona! Lockers ~- <br />14. Temporary Electrical <br />Cast for transformer <br />Charge for temporary electric <br />Temporary electric costs bid <br />Subtotal <br />15. Caulking <br />Concrete stab ~ curb wts <br />16.~ Plumbing - _ - <br />216736'? 155 r .1~4/b6 <br />2,343.00 <br />(42200) <br />(2,108.00) <br />(4,730.00) <br />3,695.00 "~ <br />5,550.00 ~' <br />940.00 <br />10,185.00 <br />3,368.72 <br />3, 854.00 <br />2,474.00 <br />367.98 <br />6,695.98 <br />(334.00) <br />(1,800.00) <br />(2, 500.00) <br />(4,300.00) <br />6,124~00 <br />946.00 <br />589.93 <br />(2,000.00) <br />(464.07)' <br />2,000.04 <br />