Laserfiche WebLink
.~ y <br />R~~ <br />WORK ORDER N0.2 <br />NORTHWEST QUADRANT PROJECT -SITE ROADWAY PLANS <br />UR.S GREINER /HAYFIELD VILLAGE <br />AGREEMENT DATED FEBRUARY 3,1998 <br />This Work Order Task is being performed as an extension of the Professional Engineering Services <br />Agreement between Mayfield Village and URS Greiner (URSG) dated February 3, 1998. All terms and <br />conditions stated therein aze incorporated into this Work Order by reference. <br />SCOPE OF SERVICES <br />URSG will provide the following specific consulting services to prepare construction drawings associated <br />with a 3,600 lineal foot, 27 wide, 21ane roadway located on the Village's property between S.O.M. Center <br />Road and White Road, servicing the "Progressive" site. <br />Utilizing the base topographical mapping already procured by the Client, URSG will prepaze plan, <br />typical sections and detail drawings showing the locations, elevations, arrangements and details <br />associated with the new roadway and storm sewer system including catch basin, outlet piping, and <br />headwall structures. URSG shall also prepaze the work/material specification sections required for <br />the execution of the planned improvements. The documents shall be prepazed following Mayfield <br />Village's standards as applicable. <br />2. URSG shall prepaze Dedication Plats for the new roadways. <br />URSG shall prepare an estimate of the probable construction cost of the improvements reflected in <br />the completed detail plans. <br />4. URSG shall field stake proposed roadway centerlines and provide references of control points for the <br />contractor. <br />ADDITIONAL SERVICES <br />R <br />In addition to the Basic Scope of Services provided under this Work Order, URS Greiner can provide the <br />following services when authorized, in writing, by the Client: <br />Prepare a property boundary survey of the Golf Course utilizing the lot split plat previously prepared <br />for the Village and set property pins at all comers of the subdivided property. <br />2. Prepare easement drawings and legal descriptions for proposed utilities, drainage courses and <br />appurtenances. <br />Prepaze construction bid packages and review bids. <br />ESTIMATED COST <br />The total work order costs will be based on only the actual labor hours and reimbursable expenses expended <br />on the Project. URS Greiner's compensation for this Work Order will not exceed the authorized amount of <br />Twenty-Eight Thousand ($28,000.00) Dollars without further written approval from the Client. <br />Q:~BD150306Q~II~T-VIEW 1WKORD2T0. WPD <br />URS Greener <br />