Laserfiche WebLink
A <br />WORK ORDER NO: 9 <br />NORTHWEST QUADRANT PROJECT -S.O.M. CENTER/WHITE ROAD WIDENING <br />TEMPORARY SIGNALIZATION <br />DESIGN AND PLAN PREPARATION DOCUMENTS <br />URS GREINER /HAYFIELD VILLAGE <br />AGREEMENT DATED FEBRUARY 3,1998 <br />This Work Order Task is being performed as an extension ofthe Professional Engineering Services Agreement <br />between Mayfield Village and URS Greiner (URSG) dated February 3, 1998. All terms and conditions stated <br />therein are incorporated into this Work Order by reference. This Work Order represents new services being <br />incorporated into the agreement as part of the general Modification No. 1. <br />SCOPE OF SERVICES <br />URSG will provide the following services for the design and plan preparation .documents and bid phase <br />assistance needed for temporary signals to be implemented along S.O.M. Center Road at the SOM1Wlute <br />intersection and SOM/Parkview intersection. The design and plan preparation services would be performed <br />to be consistent with ODOT standards. <br />Task One - DesiEn and Plan Preparation <br />A. Preliminary Traffic Signal Plans; Utilizing information collected from the North Chagrin Commons <br />Development project and the SOM Center Road widening project, URSG shall prepare a preliminary <br />set of traffic signal plans and will submit the same to the ODOT District 12 and Cuyahoga County <br />Engineer's office. We envision one review meeting with each entity to review the plans. The signal <br />plans will be drawn in a 1 "=20' scale and consist of the following elements : , <br />a. Title Sheet <br />b. Plan sheet showing horizontal layout and pavement markings <br />c. Timing and phasing diagram <br />d. Wiring diagram <br />e. Pole Elevations and Details <br />£ Specifications <br />g. Quantity summary <br />h. Temporary/Permanent configuration coordination drawing <br />B. Final Traffic Signal Plans; This represents the incorporation of the review comments into a final set <br />of documents for bidding. URSG will supply plans and specifications for a complete bid package. <br />C. Engineer's Estimate of Probable Construction Cost; Once the plans are finalized, URSG will prepare <br />an estimate of probable construction cost of the planned improvements. <br />Task 2 -Services During Bidding Phase: <br />The Bidding Phase will commence upon the approval by the Client of the Contract Drawings and Project <br />Manual and will terminate upon URSG furnishing the Client with an engineering recommendation concerning <br />Q;\P,DM\MAYFIELD\WKORDERS\WKORD9M0. WPD <br />URS Greiner <br />