Laserfiche WebLink
MAR. 13. 1998 5:18PM BRAPIDSTETTER CARROLi CIO. 1554 P. 8 ~_ <br />- - - - - - BXRIBIT B <br />PRELIMNINARY COST ESTIMATE <br />HAYFIELD VILLAGE AQUATIC FACILITY <br />MAYFIEI.D VILLAGE, OHIO <br />A. POOL CONSTRUCTION COST <br />1. Grading/Excavation <br />A, General Conditions/8ond/lnsurance <br />2. Main Pool Construction <br />- A. Stainless Steel Walls 2500 sf @ $40 sf <br />B. Stainless Steel <br /> Integrated Gutter _ 8001f @ $200 If <br />C. Pool Floor/Paint 12,650 sf @ $5-50 sf <br />- D. Filtration System <br />E. Circulation/Main drain <br />3. Concrete Decks 30,000 sf @ $3.50 sf <br />4. Fencing 815 If @ $15 if <br />5. Utility Allowance <br />6. Deck Equipment Allowance - - <br />7. Raindrop and other play featunrs <br />8. New Bathhouse 3800 sf @ $125 sf <br />9. SoddinglLandscaping <br />10. Water Slide . <br />. 11. Paving 17,500 sy @ $14 sy <br />12. Walks 4,000 sf @ $3.50 sf <br />13. Site Lighting and Pool Lighiting <br />14. Miscellaneous (Signage, Flagpole, etc.) <br />TOTAL <br />$ 122,000 <br />85,400 <br />100,000 <br />160,000 <br />70,675 <br />130,000 <br />85,000 <br />105,000 <br />12,225 <br />100,000 <br />32,000 <br />100,000 <br />475,000 <br />50,000 <br />135,000 <br />245,700 <br />14,000 <br />100,000 <br />31,429 <br />$2,153,429 <br />