Laserfiche WebLink
Resolution No. 2008-01 <br />Page Three <br />General Engineering Projects -Schedule 2 <br />Street Resurfacing <br />Minor Roads and Streets in Undeveloped Areas <br />Irrigation and Drainage Ditches <br />Landing Fields <br />Levees and Flood Walls <br />Off-Street Parking Lots <br />Retaining Walls <br />Sidewalks <br />Water Distribution Systems and Elevated Storage Tanks <br />Water, Coal, Oil and Gas Transmission Pipelines <br />Minimum Fees-Schedule 2 <br />Cost of Construction <br />$100,000 ..............................................9% <br />$100,000 to .$500,000 .................................Base fee of 9% of $100.,000 <br />plus 6% of amount over $100,000 <br />$500,000 to $1,000,000 ..............................Base Fee of 6.6% of $500,000 <br />plus 5% of amount over $500,0000 <br />Over $1,000,000 ..........................................Base. Fee of 6% of $1,000,0000 <br />plus 4.9% of amount over <br />$1,000,000 <br />(o) If, after the plans, profiles, specifications and estimates of costs for work <br />authorized and approved by the Council have been prepared by the Engineer, the <br />proceedings for such work is abandoned or is postponed for a period of more than six <br />(6) months, or the actual construction of such work is not commenced within nine (9) <br />months after the date of delivery of said plans, profiles, specifications and estimates of <br />costs, then he shall be paid forthwith a sum equal to 75 percent of the fee stated in <br />Section 3(b), based on the total estimated cost of said improvements, as full <br />compensation for all work done up to that date upon the subject project. In the event the <br />proceedings for such work so abandoned, or postponed, is revived and actively pursued <br />by the Village, he shall perform the balance of the services to be .rendered under this <br />Agreement and not previously performed, and he shall credit against the total <br />compensation due any payments made under Section 3(c). <br />