Laserfiche WebLink
)~ ~ <br />,~~~i T!d <br />-~."~--= Document 6701 - 2001 <br />~, <br />Change Order <br />PROJECT (ilTnnte and address): CHANGE ORDER NUMBER: 001 OWNER: Lf <br />Mw~ic.lcJ Vdhge CiminninitV Rboin DATE 5eptenihc.r 24, 20L~- - - <br />--- -- - <br />- -- - -_ --- - - - - - ~ ______ _-_ . <br /> <br />CHI1'ECT: ~ <br />--- -AR - - <br />_ _ _ t'iC>21.V1rilsonMills_Rottd -.__ _ ___ <br />Mayfield Village, 01-i 44 t43 CONTRACTOR: ^ <br /> FIELD: ^ <br />TO CONTRACTOR (A'ante arrd addressy: ARCHITECT'S PROJECT NUMBER; 01-14061 <br />Seitz Builders, Inc. CONTRACT DATE: September 8, 2015 OTHER: ^ <br />8055 Broadview Road CONTRACT FOR: Contract "A" -General Trades <br />Broadvicw.Weights, OI I 44I~[7 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Inchnlc, where rt~plicuble, arty tutdi+ntrled mm~uul ntn•ihlNahle to pret=iarslt= exectted Cotrslrrtrlion ('lraxge Ditrclives) <br />'1'O Af)ll THE POI.L,OWING Al: FERMATE TO CONTRACT "A" - GENERAL TRAt]ES <br />AL1'L`-RNA'I'E !J I - MCES SITE [NIVROVEMENI`S LOCATED ON CGNl'ER ELEMENTARY SCI f0OL S1TIi <br />This Alternate is Far the site improvements located on Mayfield Center Elementary School site and includes all Tabor, materiills, <br />equipment and services for completion of the specified work indicated as Alternate I on the drawings and described in the project <br />manual. <br />TOTAL Ant) AMOUNT Of CHANGE ORDER NO 00.1 ...................... S 75;000.00 <br />The original Contract Sum was $ 2,024.000.00 <br />The net change by previously authorizcd.Changc Orders $ 0.00 <br />The Contract'Sum prior to this Change Order .vas $ 2,024,000.00 <br />The Contract Stnillvill be increased by fliis Change Order in the amount of $ 75.000.00 <br />Tltc new Clintract.Sum including this Change Order will be $ 2,099.000.00 <br />'f11e Contract Time will be increased by Zcro (0) days. <br />The date of Silbsfatnial Completiomas of the date of this Chnnge Order theretitre is Unchanged <br />NOTE: "This Change Order does not include changes in the Contract Stmt, Contract Time or Guaranteed Maximum Price. which have <br />been authoFized by Construction Change llirc;ctive until the cost and time have been agreed upon by both the C)wtter and <br />Contractor, in which case a Change Order is executed to supersede the Calstruction. Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />'Fhenllesiglt Architecture, Ltd. Seitz Builders. Inc, Mayfield Village <br />ARCHITECT (Firer nrnne) CONTRACTOR (firm tutttre) OWNER (!"irrtr tutnre) <br />4135 Eric Street 8055 Broadview Road <br />WillDU hb ; t-I 440 Broadview [-{eights. OFI 44147 <br />A RESS ADDRESS <br />ig r rt e) 8Y (Silnrcrture) ' <br />Edward T. Parker <br />('roped ttanre) (T-~ped trmne) <br />September 24.2015 <br />DATE DATE <br />6022 Wilson Mills Road <br />INlavlield Villaee. OH 44143 <br />ttanre) <br />DATE <br />A Document G7D7 T'^ - 20D1. Copyright .1979, 87, 20DD and RD y The American Institute of Architects. All d is reserved, WARNING: This AIt1' <br />ocumont (s;prolectod.by U.S: Copyri t Lnw. d Internationa aetlos. Unauthorizap.reproduction or dlstrih ton of this AIAr~ Docunieiit, or any .~ <br />portion of 1t, may rosult i~iseverv'civil and crlminaf panaltlos. and will ba prtiaeculed to the maximum'axtoni'posslb(o urider the law-This document was <br />produced by AIA software at 11:35:11 on 09(24/2015 under OMer No.6034620566 1 which expires on 02/1112D16, and is not for resale. <br />UsorNates: (2054584676) <br />