My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016 024 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2016 Ordinances
>
2016 024 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:11:57 PM
Creation date
9/11/2018 6:35:18 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
024
Date
12/19/2016
Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~~ E264`Cet <br />INF,TCC~~HPEi~ <br />~~ ~~~'r~JEt;~ <br />May 2016 <br />1128.06 APPLICATION P1~OCEDURES <br />A. Pre-Application Meeting The applicant shall attend aPre-Application Meeting with the Village <br />Engineer to discuss the proposed project, review the requirements of this regulation, identify <br />unique aspects of the project that must be addressed during the review process, and establish a <br />preliminary review and approval schedule. <br />B. Preliminary Comprehensive Stormwater Management Plan: The applicant shall submit two (2) <br />sets of a Preliminary Comprehensive Stormwater Management Plan (Preliminary Plan) and the <br />applicable fees to the Mayfield Village Building Department. The Preliminary Plan shall show <br />the proposed property boundaries, setbacks, dedicated open space, public roads, water resources, <br />stormwater control facilities, and easements in sufficient detail and engineering analysis to allow <br />the Village Engineer to determine if the site is laid out in a manner that meets the intent of this <br />regulation and if the proposed SCMs are capable of controlling runoff from the site in compliance <br />with this regulation. The applicant shall submit two (2) sets of the Preliminary Plan and <br />applicable fees as follows: <br />1. For subdivisions: In conjunction with the submission of the preliminary subdivision plan. <br />2. For other construction projects: In conjunction with the application for a zoning permit. <br />For general clearing_projects: In conjunction with the application for a zoning permit. <br />C. Final Comprehensive Stormwater Management Plan: The applicant shall submit two (2) sets of a <br />Final Comprehensive Stormwater Management Plan (Final Plan) and the applicable fees to the <br />Mayfield Village Building Department in conjunction with the submittal of the final plat, <br />improvement plans, or application for a building or zoning permit for the site. The Final Plan <br />shall meet the requirements of Section 1128.08 and shall be approved by the Village Engineer <br />prior to approval of the final plat and/or before issuance of a building permit by the Building <br />Department. <br />D. Review and Comment: The Village Engineer shall review the Preliminary and Final Plans <br />submitted, and shall approve or return for revisions with comments and recommendations for <br />revisions. A Preliminary or Final Plan rejected because of deficiencies shall receive a narrative <br />report stating specific problems and the procedures for filing a revised Preliminary or Final Plan. <br />E. Approval Necessary Land clearing and soil-disturbing activities shall not begin and zoning <br />and/or building permits shall not be issued without an approved Comprehensive Stormwater <br />Management Plan. <br />F. Valid for Two Years: Approvals issued in accordance with this regulation shall remain valid for <br />two (2) years from the date of approval. <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.