My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016 024 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2016 Ordinances
>
2016 024 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:11:57 PM
Creation date
9/11/2018 6:35:18 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
024
Date
12/19/2016
Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J CHIkGRtE~ <br />~.. r~ F:lG~E4~ <br />\'L~~TER~N+EB <br />• ~ " E~~~iTP~E[~S <br />~_. <br />events as defined in Table 2. <br />moray 2016 <br />e. Sites within watersheds of Coldwater habitat streams shall include SCMs to <br />infiltrate the water quality volume or reduce the temperature of discharged <br />runoff. SCMs that reduce the temperature of discharged runoff include <br />bioretention, permeable pavement, underground detention, and incorporation of <br />shading and infiltration in parking lot design. <br />f. Each practice shall be designed to facilitate sediment removal, vegetation <br />management, debris control, and other maintenance activities defined in the <br />Inspection Plan and Maintenance Agreement for the site. <br />Table 2: Draw Down Times for Stormwater Control Measures <br />Stormwater Control Measure Drain Time of WQv <br />Infiltration Basin or Trench' 48 hours <br />Permeable Pavement -Infiltration' 48 hours <br />Permeable Pavement -Extended Detention 24 hours <br />Extended Detention Facilities <br />^ Dry Extended Detention Basing 48 hours <br />^ Wet Extended Detention Basin 3 24 hours <br />^ Constructed Wetlands (above permanent pool) a 24 hours <br />^ Bioretention Area/Cells,6 24 hours <br />^ Sand and other Media Filtrations 24 hours <br />^ Pocket Wetland' 24 hours <br />~ Practices designed to fully infiltrate the WQ~ shall empty within 48 hours to provide storage for subsequent <br />storm events. <br />z The use of a forebay and micropool is required on al] dry extended detention basins. Each is to be sized at a <br />~niniinum ] 0% of the WQ~. 3Provide both a permanent pool and an extended detention volume above the <br />permanent pool, each sized with at least 0.75*WQv . <br />4Extended detention shall be provided for the WQv above the permanent water pool. <br />s The surface ponding area shall completely empty within 24 hours so that there is no standing water. Shorter <br />drawdown times are acceptable as long as design criteria in Rainwater and Land Development have been met. <br />6 This includes grassed linear bioretention, which was previously titled enhanced water quality swale. <br />Pocket wetlands must have a wet pool equal to the WQ~, with 25% of the WQ~ in a pool and 75% in marshes. <br />The EDP, above the permanent pool must be equal to the WQ,.. <br />Additional criteria apple to infiltration facilities. <br />a. Infiltration facilities should be designed to meet all criteria in Rainwater and <br />Land Development. <br />b. All runoff directed into an infiltration basin must first flow through a <br />pretreatment practice such as a grass channel or filter strip to remove coarser <br />sediments that could cause a loss of infiltration capacity. <br />c. During construction, all runoff from disturbed areas of the site shall be diverted <br />away from the proposed infiltration basin site. No construction equipment shall <br />be allowed within the infiltration basin site to avoid soil compaction. <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.