My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/19/1999 Meeting Minutes
>
Mayfield Village
>
Meeting Minutes
>
1999
>
04/19/1999 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 9:12:53 AM
Creation date
7/19/2018 10:15:02 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Meeting Minutes
Date
4/19/1999
Year
1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FEB- 9-99 TUE 11:06 FAX N0, 216+464+3317 P,02 <br />? <br />, <br />i <br />? <br />? <br />l? <br />.° <br />•, ? <br />`_ . .. _ <br />PaQe two <br />02-09-99 <br />There is credit that wiil be receivcd for deleting scope of work from the present pool <br />contract, but tlie exact amount of that credit will not be determined until a more specitic <br />scoPc af work is created. <br />If Mayfield Village is interested in pursuing the pool deck or gool deck and night <br />svriminin= options, please contact us so that a promgt final cost can be esta6lished based <br />ugon scope review with the pool contractor. <br />Z'he NightVisioci scope vf work includes: <br />? Lightin, de5ign drawings in Autocad Vl4 fonnat by an individual certified by the <br />NCQLP. <br />• Pheiumct.ric study utilizing the manufacturer's IES formatted photometric tiles wich <br />Lurnen Micro 7.5. <br />? Coordination of the cable sleeves being provided under another contract with Mayfield Villaae, and the coardinatian of all new exterior lighting componen[s with <br />the Project Manager / Architect for the new roadway. <br />• Coorciination of the trench and backfill beincr provided under another contract with <br />Mayfieid Village, and the coordination of this activity with the Project Manager / <br />Arc!utect for thc; ncw raadway. <br />? Coordination of the lightin; circuits and control devices being provicied under <br />another contract with Mayfield Village, and the coordination of all new exterior <br />lighting components with the Project Manager / Architect for the new pool. <br />? All cnaterial, labor, and supervision necessary for a complete installation of all <br />components not being provided under other contracts with iVlayfield Village to <br />provided a completely operational lighting and control system with the pole <br />quantities described within each quoted area. <br />Pkease note that banner azm inserts have been pravided within the above pricing for all <br />concrete paleti. The cos[ for the banner arm or other pole accessories is not included <br />within the above pricing structure. All lighting and pole assemblies have been quoted Lo <br />match those materizil integrated inta the original North Chagrin Comuions project. <br />Ii' you have aiiy questions on the ahove, please feel to contact me. <br />Respectfull,i Submitted, <br />` -? <br />Phillip G. Soroky, LC, IESNA <br />Projcct Engincer <br />VISION <br />NIG..........HT.......... . <br />............... <br />Li?htin? Sen?ices
The URL can be used to link to this page
Your browser does not support the video tag.