My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/28/2004 Meeting Minutes
DOcument-Host
>
Mayfield Village
>
Meeting Minutes
>
2004
>
06/28/2004 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 9:27:03 AM
Creation date
7/18/2018 5:52:05 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Meeting Minutes
Date
6/28/2004
Year
2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Regular Council Minutes <br />6-28-04 <br />Page 16 <br />Mrs. Mills asked Mr. Metzung to explain where that hydrant is. <br />Mr. Metzung said that hydrant is not next to the street. It is a"private" hydrant located next to <br />the Service Building. <br />Mr. Marquardt, seconded by Mrs. Cinco, made a motion to authorize an expenditure not to <br />exceed $3,500 (vendor to be determined) for fire hydrant repair at 610 S.O.M. Center Road. <br />ROLL CALL: AYES: All <br />NAYS: None <br />¦ A motion to authorize an expenditure not to exceed $4,437.72 to Power Ware for <br />uninterrupted power supply (for 9-1-1, the village telephone & computer system) <br />Mr. Saponaro, seconded by Mr. Marquardt, made a motion to authorize an expenditure not to <br />exceed $4,437.72 to Power Ware for uninterrupted power supply (for 9-1-1, the village telephone <br />& computer system.) <br />Motion Carried <br />Expenditure Authorized <br />r <br />r <br />I <br />ROLL CALL: AYES: All <br />NAYS: None <br />Motion Carried <br />Expenditure Authorized <br /> <br />Discussion of a motion to authorize an expenditure in the amount not to exceed <br />$20,000 to Frost Build'ung Maintenance or C& J Contractors for removal of east <br />and west steeple, tower stabilization and temporary roof installation at former <br />United Methodist Church <br />MOTION POSTPONED <br />Mr. Marrie stated that was Postponed (per Finance Committee discussion.) <br />A motion to authorize an expenditure not to exceed $20,000 to Frost Building <br />Maintenance or C& J Contractors for removal of east and west steeple, tower <br />stabilization and temporary roof installation at the former Mayfield United <br />Methodist Church <br />MOTION POSTFONED <br />¦ A motion to authorize an additional expenditure of $200 to Suglia Trenching Co. for <br />extra work of cutting and replacernent of a section of concrete patio for septic <br />replacement system at Village owned property at 6565 Highland Rd. ($7,865 had <br />already been approved by motion 4/26/04) <br />; Mr. Saponaro, seconded by Dr. Parker, made a motion to authorize an additional expenditure of <br />??- $200 to Suglia Trenching Co. for extra work of cutting and replacement of a section of concrete <br />patio for septic replacement system at Village owned property at 6565 Highland Rd. ($7,865 had <br />already been approved by motion 4/26/04) <br />
The URL can be used to link to this page
Your browser does not support the video tag.