My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/21/2012 Meeting Minutes
DOcument-Host
>
Mayfield Village
>
Meeting Minutes
>
2012
>
05/21/2012 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 9:28:49 AM
Creation date
7/24/2018 5:27:57 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Meeting Minutes
Date
5/21/2012
Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Minutes of the Regular Meeting of Council <br />Monday, May 21, 2012 <br />Page 10 <br />Mr. Metzung sta.ted, where we are at now is the final shaping and capping. It's something we <br />need to do. We need to get grass growing on that hill in order to keep us EPA compliant with <br />storm water drainage. No matter what we do with that site, we need to get grass to grow on it. <br />That's what this is basically about at this point. <br />Mr. Marquardt asked, are there extended plans for this in existence? <br />Mr. Metzung asked, a set of plans? <br />Mr. Marquardt asked, extended plans for this amphitheatre in existence? <br />Mr. Metzung replied, not that I am aware of it. <br />Mr. Marquardt asked, are you aware of it, Ms. Wolgamuth? <br />Ms. Wolgamuth replied, I am not. No. We have talked about the possibility of looking for <br />funding for staging and lighting in the future, but no, there is not a plan. <br />Council President Buckholtz stated, so, just to review where we are at. I want to mention for <br />anyone new in the audience, everything we are passing we have discussed in committee and at <br />Council Caucuses. This particular item is something that we had the ability to start years ago as <br />we started all kinds of projects in the Parkview area. We used it for a training area for a lot of <br />the equipment we had. I had met with Bruce back then and we had kind of noticed the natural <br />inclination of the land that it would make for an outdoor facility. I agree with you, Mr. <br />Marquardt, that there has never been a plan. This is something that we have just kind of kept <br />chipping away at and working on. It's been a place where we can dump dirt that otherwise we <br />would have paid to haul away, is that fair to say? Or allowed other people to bring the dirt there <br />and drop it for us. Can you explain, I hate to do this to you again, but can you explain again <br />where we are standing? Again, we have already heard from one resident a problem with dust <br />and dirt. You are saying the EPA will require us to cap and shape? <br />Mr. 1Vletzung replied, you can't leave ground that's been disturbed unprotected. As long as we <br />are maintaining it and working it, it was okay. Now we have come to a point where we are <br />fuushing that phase of the project so now we need to finish shaping and put some topsoil on it so <br />we can get grass to grow on it. For the time being, if nothing else, I have to have grass on this <br />hill. <br />Mr. Marquardt stated, in the years of this development, a plan would have been reasonable to <br />expect. This has been going on for some period of time. <br />Ms. Wolgamuth stated, if I may Mr. Marquardt, do you mean a plan for the shape of the <br />amphitheatre? <br />Mr. Marquardt replied, no, I am talking about the whole .plan. How much is the thing going to <br />cost? Somebody's got an idea of what this is going to look like and how much the total cost is
The URL can be used to link to this page
Your browser does not support the video tag.