My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/20/2005 Meeting Minutes
DOcument-Host
>
Mayfield Village
>
Meeting Minutes
>
2005
>
06/20/2005 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 9:30:40 AM
Creation date
7/24/2018 8:46:43 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Meeting Minutes
Date
6/20/2005
Year
2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFT <br />Council6/20/OS <br />Page 21 <br />4 A motion to authorize an additional expenditure in the amount not to exceed <br />$6,080 to Header Construction as change order work at Civic Center <br />Mrs. Mills made a motion, seconded by Mr. Marrie to authorize an expenditure in the amount <br />not to exceed $ 6,080 to Header Construction as change order work at the Civic Center. <br />Mrs. Cinco questioned what work. <br />Mr. Metzung stated it was for carpentry work at the Civic Center, the Finance area had a lot <br />more built in, closets, things of that nature. <br />Roll Call: AYES: All <br />NAYS: None <br />Motion Carried <br />• A motion to authorize an expenditure for Modification of Work Order No. 7, <br />Modification No. 12 in the amount not to exceed $326,000 for Engineer Services <br />for SOM Widening. <br />Mrs. Mills made a motion, seconded by Mr. Marrie to authorize an expenditure for Modification <br />of Work Order No. 7, Modification No. 12 in the amount not to exceed $ 326,000 for Engineer <br />Services for SOM Widening. <br />Mr. Metzung stated this was for continuous inspection and engineering on the SOM Project, <br />because this project carries on through August: <br />Mr. Marquardt questioned how many people and for how long. <br />Mr. Metzung said he was sure it includes a staff between four and five, three on site, Mr. Dillon <br />and Mr. Koo from the main office. There were two or three inspectors on site at all times. Right <br />now, we have three full-time inspectors. <br />Mr. Marquardt wanted to know the number. <br />Mr. Brett stated he will go back and get the number. <br />Mr. Buckholtz wanted a description of the length of time and the number of man hours that they <br />were working, what this represents. Mr. Buckholtz asked to hold this until July until Mr. Brett <br />gets the explanation. <br />Mrs. Mills made a motion to withdraw this motion, seconded by Mr. Marrie <br />Roll Call: AYES: All <br />NAYS: None Motion Withdrawn
The URL can be used to link to this page
Your browser does not support the video tag.