Laserfiche WebLink
Regular Council Meeting <br />9-24-01 <br />Page 8 <br />Mr. Brett said I handed that out to Council. <br />Several members of Council said it was in the appropriation ordinance. <br />Mayor Rinker said I just want to make sure we are all on the same page. We have already done how <br />much work this year on the roads? <br />Mr. Cappello said the number in here, the $195,889, [on the agenda] is actually the base bid. That is <br />the contract that we awarded originally. The alternate they are talking about--Option One is <br />Alternate A. That was for $186,769. That would include resurfacing Hickory Hill using a geogrid, a <br />crack non-reflector type of material. There was an Alternate B which uses a standard geotextile <br />fabric of $136,000. The number here reflects the base bid. Option A would be $187,000 and Option <br />B would be $136,000. That is construction costs--not including engineering or inspection. <br />Mayor Rinker: I confess, I am confused because I thought, because I heard about this earlier today-- <br />that this is now talking about resurfacing a concrete street which we haven't done that before--am I <br />correct? <br />Mr. Metzung said no. <br />Mayor Rinker: So, I just want to understand--what was everyone's discussion--was it between <br />Safety and Service, between the Finance Committee--because we are talking over and above what <br />we have already committed this year. - <br />Mr. Brett said right, it is an additional cost. <br />Mayor Rinker: I wanted to make sure we are all on the same wave length as to what kind of <br />expenditures we talked about in the program because we have already spent how much? <br />Mr. Cappello: We are going to be close to that. We have a contingency asnount in the base bid so <br />we are going to be pretty close to the $195,889. <br />Mayor Rinker: That's for? <br />Mr. Cappello: Work we are doing presently. <br />Mayor Rinker: Which is concrete work on what streets? <br />Mr. Cappello: Hickory Hill, we are doing work on Kenwood, Oakwood, one small section on <br />Aintree and some work on Brainblewood, I believe, and Wildwood. That is concrete section repair. <br />That is just patchwork. Then we are doing Hemingway and Joyce resurfacing and... <br />Mayor Rinker: For asphalt.